Back to bathroom remodel contractors
Aptus Construction
- Based in
- Oakland
- On San Francisco permits
- Sep 2020 to Aug 2026
- Last 24 months
- 10 permits filed
17 permits since 2000: 7 completed, 7 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 3 completed, 3 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 842 45th Av | 844 45th avenue upper unit: kitchen and two bathroom remodel. new cabinets, new tile, new appliances, new plumbing and electrical fixtures. new flooring throughout the unit. no removal of walls. in kind - remodel for bathroom and kitchen.Details
844 45th avenue upper unit: kitchen and two bathroom remodel. new cabinets, new tile, new appliances, new plumbing and electrical fixtures. new flooring throughout the unit. no removal of walls. in kind - remodel for bathroom and kitchen. | $75,000 |
| Apr 9, 2025 | Completed final sign-off Jun 2025 | 777 Le Conte Av | (2) baths & (1) kitchen remodel. new tile, counters, replace plumbing & electrical fixtures. appliances and paint. add lighting at livingroom w/ led lights. add lighting in bedroom and hallway. all in kind.Details
(2) baths & (1) kitchen remodel. new tile, counters, replace plumbing & electrical fixtures. appliances and paint. add lighting at livingroom w/ led lights. add lighting in bedroom and hallway. all in kind. | $22,500 |
| Nov 15, 2024 | In progress issued Feb 2025 | 2539 Lake St | unit 2- adding (n) lighting in kitchen, living room, bedrooms, and hallway . remove and replace walls between living room and dining room. living room becomes office. replace toilet frange in bathroom. reconfiguring door ways in dining room and kitchen. add a closet for storage. modify 2 (e) closetsDetails
unit 2- adding (n) lighting in kitchen, living room, bedrooms, and hallway . remove and replace walls between living room and dining room. living room becomes office. replace toilet frange in bathroom. reconfiguring door ways in dining room and kitchen. add a closet for storage. modify 2 (e) closets | $21,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 355 Buena Vista East Av | open up walls in living room, bedroom, bathroom & hallway to run new wiring for new baseboard heaters, new washer & dryer from new panel to designated areas. install new shelves in laundry room.Details
open up walls in living room, bedroom, bathroom & hallway to run new wiring for new baseboard heaters, new washer & dryer from new panel to designated areas. install new shelves in laundry room. | $9,200 |
| May 1, 2024 | Completed final sign-off Jun 2024 | 894 Steiner St | partial one bathroom remodel, like for like, replace /install new sheetrock, new tile on shower flrs & walls, replace shower valve / same location, reinstall sink & toilet/ same location, install new glass shower door, replace outlets & switch, trims, new paint. exist. vanity and toilet to remain.Details
partial one bathroom remodel, like for like, replace /install new sheetrock, new tile on shower flrs & walls, replace shower valve / same location, reinstall sink & toilet/ same location, install new glass shower door, replace outlets & switch, trims, new paint. exist. vanity and toilet to remain. | $6,300 |
| Aug 8, 2023 | Completed final sign-off Dec 2023 | 300 Ivy St | unit 409: remove bath tub, install walk in shower- new plumbing- shower pan- fixtures and new tile. no electrical work- no structural work.no other work; reuse lavatory, toilet.Details
unit 409: remove bath tub, install walk in shower- new plumbing- shower pan- fixtures and new tile. no electrical work- no structural work.no other work; reuse lavatory, toilet. | $7,800 |
| Jan 14, 2021 | Expired or cancelled expired Feb 2026 | 440 Avila St | remodel in like kind kitchen & bath.Details
remodel in like kind kitchen & bath. | $20,000 |
| Sep 19, 2020 | Expired or cancelled expired Feb 2026 | 436 Avila St | remodel (e) floor plan of unit. add 1/2 bathroom, remove partion walls, kitchen & bathroom remodeling.Details
remodel (e) floor plan of unit. add 1/2 bathroom, remove partion walls, kitchen & bathroom remodeling. | $35,000 |