Back to bathroom remodel contractors
Apex Pro Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to Apr 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2024 | Completed final sign-off Dec 2024 | 157 Beaver St | remodel one bathroom move tub, and sink add gfci fix leaking pipes as needed,closing closet door / open back. toilet clearances to be maintained. non structuralDetails
remodel one bathroom move tub, and sink add gfci fix leaking pipes as needed,closing closet door / open back. toilet clearances to be maintained. non structural | $11,000 |
| Dec 4, 2023 | Completed final sign-off Apr 2024 | 1035 Chenery St | kitchen remodel and bathroom remodel like for like. replace in kind. no changes to the wall layout.Details
kitchen remodel and bathroom remodel like for like. replace in kind. no changes to the wall layout. | $10,000 |