Anything Is Possible Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2026 to May 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2026 | Completed final sign-off Jul 2026 | 1444 Egbert Av | to comply wiht nov#: 202651039; reverse front security door swinging to inward, remove bollards at front exterior wall. legalize of interior partitions modifications.Details
to comply wiht nov#: 202651039; reverse front security door swinging to inward, remove bollards at front exterior wall. legalize of interior partitions modifications. | $40,000 |
| Mar 30, 2026 | Completed final sign-off Apr 2026 | 640 Jackson St | commercial restaurant: install new electrical outlets, saw cut concrete slab to install new floor sink, update plumbing.Details
commercial restaurant: install new electrical outlets, saw cut concrete slab to install new floor sink, update plumbing. | $3,000 |
| Feb 9, 2026 | Completed final sign-off May 2026 | 306 Crescent Av | interior remodel of (1) (e) kitchen and (2) (e) bathrooms. replace cabinets, countertops, plumbing fixtures and finishes in kind. no structural work, no changes to the (e) floor plan. no relocation of plumbing fixtures.Details
interior remodel of (1) (e) kitchen and (2) (e) bathrooms. replace cabinets, countertops, plumbing fixtures and finishes in kind. no structural work, no changes to the (e) floor plan. no relocation of plumbing fixtures. | $47,000 |