Back to bathroom remodel contractors
Anxin Associates Construction Inc.
- Based in
- Castro Valley
- On San Francisco permits
- May 2013 to Sep 2020
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 72 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2020 | Completed final sign-off May 2022 | 362 Judson Av | convert (e) storage area in grage level into 1 bedroom, 1.5 bathrooms. remodel (e) kitchen & (e) bathroom on upper level. replace interior stairs. cover/enclose lightwell.Details
convert (e) storage area in grage level into 1 bedroom, 1.5 bathrooms. remodel (e) kitchen & (e) bathroom on upper level. replace interior stairs. cover/enclose lightwell. | $125,000 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 538 Castro St | move existing partition wall, new partition wall, add electrical outlet, replace bathroom fixture, one new counter sink & 5 new doors.Details
move existing partition wall, new partition wall, add electrical outlet, replace bathroom fixture, one new counter sink & 5 new doors. | $20,000 |