Back to bathroom remodel contractors
Anthem Green Developers Inc.
- Based in
- Saratoga
- On San Francisco permits
- May 2020 to Jul 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 16 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2021 | Completed final sign-off Nov 2021 | 999 Green St | add some reflective ceiling in couple of rooms. new recessed lights and light fixtures in dining over kitchen island, foyer. painting a couple of rooms. some plumbing changes, change few faucets in kitchen and bathDetails
add some reflective ceiling in couple of rooms. new recessed lights and light fixtures in dining over kitchen island, foyer. painting a couple of rooms. some plumbing changes, change few faucets in kitchen and bath | $30,000 |
| May 14, 2020 | Completed final sign-off Jul 2021 | 255 Berry St | like for like kitchen & bath remodel. no structural work. (n) kitch counters, cabinets, appliances, island. minor mod to relocate refridg & (n) wine cooler, (n) non-load bearing wall. replace single lav counter w/ (n) double lav vanity, replace toilet w/ (n), replace tub w/ (n) shower, (n) finishesDetails
like for like kitchen & bath remodel. no structural work. (n) kitch counters, cabinets, appliances, island. minor mod to relocate refridg & (n) wine cooler, (n) non-load bearing wall. replace single lav counter w/ (n) double lav vanity, replace toilet w/ (n), replace tub w/ (n) shower, (n) finishes | $60,000 |