Back to bathroom remodel contractors
Anleu Construction
- Based in
- Oakland
- On San Francisco permits
- Sep 2008 to May 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 8 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2021 | Completed final sign-off Jun 2022 | 778 Green St | remodel (2) 1/2 baths: rpelace toilet, sink & bathtub. retile. new cabinets and fixturs. update electrical & lumbing. no change to layout of walls & openings.Details
remodel (2) 1/2 baths: rpelace toilet, sink & bathtub. retile. new cabinets and fixturs. update electrical & lumbing. no change to layout of walls & openings. | $12,000 |
| Sep 2, 2008 | Completed final sign-off Feb 2009 | 1690 Union St | unit #2- change occupancy from retail to office/yoga/pilates, create 3 offices, 1 reception, 2.5 studios & update bath to ada compliance. new wood non-structural framing for walls w/additional electrical & plumbing to upgrade (e) bathroom to ada. (no change to envelope). no mechanical work.Details
unit #2- change occupancy from retail to office/yoga/pilates, create 3 offices, 1 reception, 2.5 studios & update bath to ada compliance. new wood non-structural framing for walls w/additional electrical & plumbing to upgrade (e) bathroom to ada. (no change to envelope). no mechanical work. | $28,000 |