Back to bathroom remodel contractors
Angelo Salarpi Construction
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Dec 2015
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2013 | Completed final sign-off Oct 2013 | 1900 Santiago St | bathroom remodel. no change in configuration or size. new low flow toilet, new sink, new shower valve, new wall board, new insulation, new lighting to be fluorescent, panasonic fan light combo. discharge 3' from openings and property line.Details
bathroom remodel. no change in configuration or size. new low flow toilet, new sink, new shower valve, new wall board, new insulation, new lighting to be fluorescent, panasonic fan light combo. discharge 3' from openings and property line. | $18,000 |
| Feb 27, 2013 | Completed final sign-off May 2013 | 120 Page St | remove & replace 2 tub surrounds, remove frp board replace with tile. install hardie tile backer, tile surface. bathrooms in hallway west end of building next to elevator. bathroom on 2/f & 3/f only.Details
remove & replace 2 tub surrounds, remove frp board replace with tile. install hardie tile backer, tile surface. bathrooms in hallway west end of building next to elevator. bathroom on 2/f & 3/f only. | $5,000 |
| Feb 9, 2007 | Completed final sign-off Feb 2008 | 265 Ewing Tr | legalize (e) non-conforming first story room. remove & replace (e) walls, add closet. remodel (e) bathroom.Details
legalize (e) non-conforming first story room. remove & replace (e) walls, add closet. remodel (e) bathroom. | $45,000 |
| Oct 23, 2002 | Completed final sign-off Nov 2002 | 1543 17th Av | bathroom repairs including: remove/replace tub/shower valve, vanity & top, install new tile tub/flrDetails
bathroom repairs including: remove/replace tub/shower valve, vanity & top, install new tile tub/flr | $8,000 |