Back to bathroom remodel contractors
Andrew Zhao's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jul 2017
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2016 | Completed final sign-off Jul 2019 | 91 Canyon Dr | 2 story rear and side addition, interior renovations(n) stair connect 1st & 2nd floors;(n)finishes@exterior facade(stucco & tile);(n) 1st story awning (n)garage door to match (e)in site;replace windows (n)front planters and 6' wood fence/gae 1 new bath on 2nd floorDetails
2 story rear and side addition, interior renovations(n) stair connect 1st & 2nd floors;(n)finishes@exterior facade(stucco & tile);(n) 1st story awning (n)garage door to match (e)in site;replace windows (n)front planters and 6' wood fence/gae 1 new bath on 2nd floor | $90,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 921 Athens St | legalize in-law unit @ 1st floor per ordinance 43-14. add 2 bedrooms, 1 kitchen & 2 bathrooms.Details
legalize in-law unit @ 1st floor per ordinance 43-14. add 2 bedrooms, 1 kitchen & 2 bathrooms. | $7,000 |
| Apr 21, 2015 | Never finaled issued Jun 2016, no final | 945 Woolsey St | 2 story rear addition, 1st floor: laundry, 1 bedroom, 1 bath, 2nd floor: sun roomDetails
2 story rear addition, 1st floor: laundry, 1 bedroom, 1 bath, 2nd floor: sun room | $100,000 |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 171 Wawona St | remodel e bath and add new bath at 3rd fl. remodel e kitchen at 2nd floor. mreove wall and replace with beam and postDetails
remodel e bath and add new bath at 3rd fl. remodel e kitchen at 2nd floor. mreove wall and replace with beam and post | $28,000 |
| Jan 30, 2009 | Completed final sign-off Jul 2009 | 195 Topeka Av | remodel extg kitchen and bathroom. add one bathroom downstair. new panel.new plumbing. new drywall and new painting.Details
remodel extg kitchen and bathroom. add one bathroom downstair. new panel.new plumbing. new drywall and new painting. | $25,000 |
| Jul 1, 2008 | Completed final sign-off Oct 2008 | 230 Stonecrest Dr | kitchen renovation, replace cabinets, countertops, flooring, sink and light. remove existing wall between kitchen and dinning room. bath removation @ 2nd floor, replace, tub, vanity sink and flooring.Details
kitchen renovation, replace cabinets, countertops, flooring, sink and light. remove existing wall between kitchen and dinning room. bath removation @ 2nd floor, replace, tub, vanity sink and flooring. | $15,000 |
| Oct 9, 2007 | Expired or cancelled expired Jul 2008 | 3538 Jennings St | rearrange 1st and 2nd fl bathroom, remove 2nd fl walls of kitchen and bathrm. relocate furnace, washer and dryer. add walk-in closet at ground floor. replace unsound gyp. bd at ceiling and wall.Details
rearrange 1st and 2nd fl bathroom, remove 2nd fl walls of kitchen and bathrm. relocate furnace, washer and dryer. add walk-in closet at ground floor. replace unsound gyp. bd at ceiling and wall. | $25,000 |
| May 18, 2007 | Completed final sign-off Sep 2007 | 2438 36th Av | remodel (e) master bathroom at 2nd floor and closetDetails
remodel (e) master bathroom at 2nd floor and closet | $8,000 |