Back to kitchen remodel contractors
Andrew Chekene Enterprises/ Dba Ac Enter
- Based in
- Hayward
- On San Francisco permits
- Aug 2007 to Sep 2026
- Last 24 months
- 38 permits filed
428 permits since 2000: 339 completed, 23 in progress, 18 never finaled, 48 expired or cancelled.
Of the 18 never-finaled permits, 5 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 5 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2022 | Completed final sign-off Jun 2023 | 308 Green St | insulation, drywall, bathrooms wet walls and kitchen cabinets. work due to water intrusion. all work in kind. non structural.Details
insulation, drywall, bathrooms wet walls and kitchen cabinets. work due to water intrusion. all work in kind. non structural. | $450,000 |
| May 26, 2022 | Completed final sign-off Apr 2025 | 618 Eugenia Av | front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levelsDetails
front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levels | $735,000 |
| May 1, 2019 | Completed final sign-off Nov 2019 | 1460 Golden Gate Av | apt 10 & 20 - removal of non structural walls. construction of new walls, new cabinets, appliances, plumbing. fixtures and finishes. add bedroom and relocate kitchenDetails
apt 10 & 20 - removal of non structural walls. construction of new walls, new cabinets, appliances, plumbing. fixtures and finishes. add bedroom and relocate kitchen | $80,000 |
| Jan 14, 2019 | Completed final sign-off Jun 2019 | 1460 Golden Gate Av | #8: interior remodel reconfiguration (e) residential unit by plan. demo existing kitchen. convert dining roomto study, relocate kitchen.Details
#8: interior remodel reconfiguration (e) residential unit by plan. demo existing kitchen. convert dining roomto study, relocate kitchen. | $10,000 |
| May 16, 2014 | Completed final sign-off Jun 2014 | 525 Gough St | install in kind 2 ea. 35-1/2(w) x 71-1/2(h) fleetwood fire rated windows in guest bedroom, max u factor 0.4. install in kind 1 ea. 35-1/2(w) x 35-1/2(h) fleetwood fire rated window in kitchen above sink at courtyard. not visable from street.Details
install in kind 2 ea. 35-1/2(w) x 71-1/2(h) fleetwood fire rated windows in guest bedroom, max u factor 0.4. install in kind 1 ea. 35-1/2(w) x 35-1/2(h) fleetwood fire rated window in kitchen above sink at courtyard. not visable from street. | $10,500 |
| Oct 25, 2013 | Completed final sign-off Nov 2016 | 1195 Stanyan St | minor horizontal addition to & renovation of (e) single family residence. replace (e) windows, add small deck, expand (e) bedrooms, update mechanical & electrical systems, remodel kitchen & bath & replace (e) roof framing.Details
minor horizontal addition to & renovation of (e) single family residence. replace (e) windows, add small deck, expand (e) bedrooms, update mechanical & electrical systems, remodel kitchen & bath & replace (e) roof framing. | $500,000 |
| Oct 11, 2012 | Completed final sign-off Aug 2013 | 725 Florida St | kitchen renovation: remove old cabinets and replace with new cabinets; remove all old appliances and replace with new appliances; remove sink & faucet and replace with new fixtures; no changes in layout. lighting to comply with cec 150(k).Details
kitchen renovation: remove old cabinets and replace with new cabinets; remove all old appliances and replace with new appliances; remove sink & faucet and replace with new fixtures; no changes in layout. lighting to comply with cec 150(k). | $50,000 |
| Dec 21, 2010 | Completed final sign-off Apr 2011 | 2040 Anza St | remodel kitchen & bath, bring electrical & lighting & plumbing upto code. kitchen: at least 50% high efficacy lighting by wattage, bathroom: high efficacy or occupancy sensor.Details
remodel kitchen & bath, bring electrical & lighting & plumbing upto code. kitchen: at least 50% high efficacy lighting by wattage, bathroom: high efficacy or occupancy sensor. | $25,000 |