Andrew Adams
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Jun 2018
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2018 | Completed final sign-off Aug 2018 | 279 Graystone Tr | to comply with physical inspection report #cc-8281. less than 50% repair toback stairs, repair rotted post, replace guardrail, add ballasters and risers.Details
to comply with physical inspection report #cc-8281. less than 50% repair toback stairs, repair rotted post, replace guardrail, add ballasters and risers. | $6,000 |
| Oct 3, 2017 | Completed final sign-off Apr 2018 | 222 Castro St | remodel kitchen - base cabinets & contertop, upgrade elct. to include gfci receptacles. remove dishwasher, remove and replace in cabinet plumbingDetails
remodel kitchen - base cabinets & contertop, upgrade elct. to include gfci receptacles. remove dishwasher, remove and replace in cabinet plumbing | $10,000 |
| Jun 2, 2017 | Completed final sign-off Jul 2017 | 144 Beaver St | common area- repair 50% or less of back deck including (2) posts, (1) beam, balusters.Details
common area- repair 50% or less of back deck including (2) posts, (1) beam, balusters. | $6,000 |