Back to bathroom remodel contractors
Andalusian Builders Inc
- Based in
- Hollister
- On San Francisco permits
- May 2018 to Jun 2026
- Last 24 months
- 6 permits filed
20 permits since 2000: 18 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jun 2026 | 2121 Webster St | unit 407: remodel (1) primary bathroom in-kind, pre plumb all to stay in same locations. replace any drywall & insulation as required. repalce flooring through, update baseboards, wall paper dec and boutique cabinetry, like for like.Details
unit 407: remodel (1) primary bathroom in-kind, pre plumb all to stay in same locations. replace any drywall & insulation as required. repalce flooring through, update baseboards, wall paper dec and boutique cabinetry, like for like. | $65,000 |
| Jan 9, 2026 | Completed final sign-off Aug 2026 | 2121 Webster St | #502:remodel 1 guest bathroom in like/kind, preplumbed all to stay same locations, replace tiles, vanity, toilet and lights. drywall, paint, all items to remain in exact locations. replace any drywall & insulation as required for repairs. replace flooring through & update basebeards, wallpaper decoDetails
#502:remodel 1 guest bathroom in like/kind, preplumbed all to stay same locations, replace tiles, vanity, toilet and lights. drywall, paint, all items to remain in exact locations. replace any drywall & insulation as required for repairs. replace flooring through & update basebeards, wallpaper deco | $65,000 |
| Feb 12, 2025 | Completed final sign-off May 2025 | 1025 Powhattan Av | remodel 1 bathroom in kind. remove existing shower fixtures and reset all plumbing in kind, all electrical in kind. new tile/ new toilet all in kind.Details
remodel 1 bathroom in kind. remove existing shower fixtures and reset all plumbing in kind, all electrical in kind. new tile/ new toilet all in kind. | $25,000 |
| Jun 18, 2024 | Completed final sign-off Oct 2024 | 17 Mallorca Wy | 2nd fl, unit 17 - interior remodel. remodle bathroom, relocate washing machine, enlarge closet. no change to exterior facades or structural systemDetails
2nd fl, unit 17 - interior remodel. remodle bathroom, relocate washing machine, enlarge closet. no change to exterior facades or structural system | $10,000 |
| Jul 19, 2023 | Completed final sign-off Oct 2023 | 17 Bret Harte Tr | remodel (e) bathroom on the 4th fl. no change to exterior or structural elements. add closet in (e) bedroomDetails
remodel (e) bathroom on the 4th fl. no change to exterior or structural elements. add closet in (e) bedroom | $20,000 |
| May 2, 2023 | Completed final sign-off Nov 2023 | 2320 Hyde St | remodel in kind (1) powder room, (2) guest bathrooms, and (1) master bathroom. mechanical to remain in place, all plumbing to remain in place. total of (4) bathroomsDetails
remodel in kind (1) powder room, (2) guest bathrooms, and (1) master bathroom. mechanical to remain in place, all plumbing to remain in place. total of (4) bathrooms | $80,000 |
| Dec 12, 2022 | Completed final sign-off Mar 2023 | 2121 Webster St | remodel one guest bathroom in like/in kind, pre-plumbed shower pan. replace tiles, vanity, toilet, and lights. drywall, paint, all items to remain in exact location. update electrical finishes to remain in exact locations. replacing any drywall and insulation as required.Details
remodel one guest bathroom in like/in kind, pre-plumbed shower pan. replace tiles, vanity, toilet, and lights. drywall, paint, all items to remain in exact location. update electrical finishes to remain in exact locations. replacing any drywall and insulation as required. | $65,000 |
| Nov 2, 2022 | Completed final sign-off Mar 2023 | 2121 Webster St | remodel guest bathroom in kind: vanity, electrical, plumbing, all to remain in place. shower pre plumbed for shower pan feature. updating shower tiles, vanity, flooring. no removal of wallsDetails
remodel guest bathroom in kind: vanity, electrical, plumbing, all to remain in place. shower pre plumbed for shower pan feature. updating shower tiles, vanity, flooring. no removal of walls | $40,000 |
| Apr 29, 2021 | Never finaled issued May 2021, no final | 359 Arlington St | revision to no-plan pa# 202104128313. to comply with nov # 200450352. remodel 2 bathrooms with minor layout change for both units. repair rear stairs <50%. no structural work.Details
revision to no-plan pa# 202104128313. to comply with nov # 200450352. remodel 2 bathrooms with minor layout change for both units. repair rear stairs <50%. no structural work. | $10,000 |
| Mar 5, 2019 | Completed final sign-off Nov 2019 | 46 Cook St | remodel extg 2 story single family dwelling. excavate 1st floor at rear for window well. remove windows and bay at property line. relocate master bedroom to 1st floor. add one bathroom.Details
remodel extg 2 story single family dwelling. excavate 1st floor at rear for window well. remove windows and bay at property line. relocate master bedroom to 1st floor. add one bathroom. | $200,000 |
| Dec 21, 2018 | Completed final sign-off Apr 2019 | 4674 18th St | remodel top unit #4674a in (e) 2 family vacant building, remodel kitchen, add laundry and new master bathroom, reinforce (e) framing, no change to front facade or life safety systemsDetails
remodel top unit #4674a in (e) 2 family vacant building, remodel kitchen, add laundry and new master bathroom, reinforce (e) framing, no change to front facade or life safety systems | $30,000 |
| Dec 19, 2018 | Completed final sign-off Jun 2019 | 4674 18th St | remodel 2nd floor unit#4674 kitchen approx 200 sq ft & bathroom approx 50 sq ft. in-kind.Details
remodel 2nd floor unit#4674 kitchen approx 200 sq ft & bathroom approx 50 sq ft. in-kind. | $45,677 |
| May 29, 2018 | Completed final sign-off Jan 2024 | 1720 Larkin St | new unit at first floor,2 new bathrooms, new 3 bedroom new kitchenDetails
new unit at first floor,2 new bathrooms, new 3 bedroom new kitchen | $30,000 |