Permit GraphShortlistSan Francisco building permits since 2000

Amicay Tech Inc Dba Ami - Tech Refinishi

Contractor license
833761
State license record
Based in
San Jose
On San Francisco permits
Sep 2019 to Jan 2020
Last 24 months
0 permits filed

4 permits since 2000: 2 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 8, 2020Never finaled
issued Jan 2020, no final
403 Main Streplace shower, acrylic wall surround, no change to configuration.
Details
Permit
202001081483
Permit issued
Jan 8, 2020

replace shower, acrylic wall surround, no change to configuration.

Open the permit page

$17,381
Dec 20, 2019Completed
final sign-off Feb 2020
3662 Mission Stapt 101: remove (e) shower surrounding.install new acrylic tubline. remove (e) shower/tub trim and valve. install new pressure valanced valve wit trim.remove (e) and install new countertop. no change to footprint.
Details
Permit
201912200147
Permit issued
Dec 20, 2019
Final sign-off
Feb 27, 2020

apt 101: remove (e) shower surrounding.install new acrylic tubline. remove (e) shower/tub trim and valve. install new pressure valanced valve wit trim.remove (e) and install new countertop. no change to footprint.

Open the permit page

$6,798
Dec 3, 2019Completed
final sign-off Feb 2020
271 Shipley Stremove (e) shower/tub remove and replace (e) shower pan. install a new acrylic tub/shower wall system over (e) tile surround or subtrate. remove existing tub/shower trim and walve. install new pressure balanced valve w/trim.
Details
Permit
201912038515
Permit issued
Dec 3, 2019
Final sign-off
Feb 28, 2020

remove (e) shower/tub remove and replace (e) shower pan. install a new acrylic tub/shower wall system over (e) tile surround or subtrate. remove existing tub/shower trim and walve. install new pressure balanced valve w/trim.

Open the permit page

$12,322
Sep 13, 2019Never finaled
issued Sep 2019, no final
456 Ellsworth Stinstall new acrylic tub liner over (e) tub. install new acrylic tub/shower wall system over (e) surround or substrate.
Details
Permit
201909131591
Permit issued
Sep 19, 2019

install new acrylic tub liner over (e) tub. install new acrylic tub/shower wall system over (e) surround or substrate.

Open the permit page

$7,247