Americal-Pacific Structures
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Aug 2010
- Last 24 months
- 0 permits filed
40 permits since 2000: 18 completed, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 112 days from filing to permit and 299 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2003 | Completed final sign-off Apr 2004 | 1278 Indiana St | revise architectural drawings to modify front facade, add 4 bathrooms, install anwning @front facadeDetails
revise architectural drawings to modify front facade, add 4 bathrooms, install anwning @front facade | $1,000 |
| Nov 1, 2000 | Never finaled issued Jun 2001, no final | 507 Kansas St | install steel beams at the ground floor(ceiling), widen garage door, remodel kitchen & bath, extendDetails
install steel beams at the ground floor(ceiling), widen garage door, remodel kitchen & bath, extend | $40,000 |