Amco Construction Co.
- Based in
- San Lorenzo
- On San Francisco permits
- Mar 2000 to Mar 2021
- Last 24 months
- 0 permits filed
48 permits since 2000: 45 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off May 2021 | 475 Alvarado St | #2 - bathroom remodeling (2); replace all appliances and new tileDetails
#2 - bathroom remodeling (2); replace all appliances and new tile | $17,000 |
| Feb 6, 2020 | Completed final sign-off Mar 2020 | 1149 Munich St | replace 3 base cabinets and counter in kitchen. no layout changeDetails
replace 3 base cabinets and counter in kitchen. no layout change | $4,300 |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 2600 18th Av | replace three wood windows in front of the house. same style and operation with original grid pattern. same size, same location, max u-factor 0.32 or better.Details
replace three wood windows in front of the house. same style and operation with original grid pattern. same size, same location, max u-factor 0.32 or better. | $1,700 |
| May 2, 2018 | Completed final sign-off Sep 2018 | 1538 34th Av | kitchen remodeling - replace cabinets and counter. drywallDetails
kitchen remodeling - replace cabinets and counter. drywall | $18,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 569 Dolores St | replace dryrot lomber on deck and stair at rear side. less than 50% replacement.Details
replace dryrot lomber on deck and stair at rear side. less than 50% replacement. | $3,600 |
| Nov 2, 2017 | Completed final sign-off Apr 2018 | 452 Gellert Dr | remodel kitchen; replace cabinets. counter & appliances. window not visible from street.Details
remodel kitchen; replace cabinets. counter & appliances. window not visible from street. | $32,000 |
| Feb 10, 2017 | Completed final sign-off Mar 2017 | 758 11th Av | to obtain final inspction for work approved under pa#2010-07-13-6441. all work is complete.Details
to obtain final inspction for work approved under pa#2010-07-13-6441. all work is complete. | $3,500 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 138 Everson St | bathroom remodeling, replace tile, counter, lavatoryDetails
bathroom remodeling, replace tile, counter, lavatory | $5,300 |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 331 Nevada St | replace two (2) windows in front of house.Details
replace two (2) windows in front of house. | $3,200 |
| Sep 26, 2014 | Completed final sign-off Apr 2015 | 63 Juanita Wy | replace kitchen windows (2) with milgard woodclad; u factor not > .32; cabinetsDetails
replace kitchen windows (2) with milgard woodclad; u factor not > .32; cabinets | $25,000 |
| Sep 16, 2014 | Completed final sign-off Oct 2014 | 500 Peralta Av | repair rear exterior stairway. replace dryrot lumber o the step and guardrails less than 50% to comply with physical inspection report cc 7858Details
repair rear exterior stairway. replace dryrot lumber o the step and guardrails less than 50% to comply with physical inspection report cc 7858 | $2,300 |
| Apr 28, 2014 | Completed final sign-off Jul 2014 | 104 Peralta Av | kitchen and bath remodel- rpe;ace abinets, counter, and all plumbing, electrical applicance. to comply with cec150(k) 8 & 10Details
kitchen and bath remodel- rpe;ace abinets, counter, and all plumbing, electrical applicance. to comply with cec150(k) 8 & 10 | $27,800 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 124 Romain St | convert laundry at 1st floor to bathroom and laundry.Details
convert laundry at 1st floor to bathroom and laundry. | $15,000 |
| Sep 10, 2013 | Completed final sign-off Oct 2013 | 2055 17th Av | replace dry rot lumber on front wall around the garage doorDetails
replace dry rot lumber on front wall around the garage door | $3,800 |
| Aug 2, 2013 | Completed final sign-off Oct 2013 | 3931 23rd St | replace 3 wood windows at 1st floor front. marvin tilt pac with ogee lugs, common doubel hungsDetails
replace 3 wood windows at 1st floor front. marvin tilt pac with ogee lugs, common doubel hungs | $2,600 |
| Jul 16, 2012 | Completed final sign-off Nov 2012 | 1773 Hayes St | kitchen & bathroom remodel, new sheetrock on walls & ceiling. replace all plumbing, electrical fixtures. replace windows at rear in kind, not visible from the street. max u faxtor .40, lighting to comply with cec 150 (k)Details
kitchen & bathroom remodel, new sheetrock on walls & ceiling. replace all plumbing, electrical fixtures. replace windows at rear in kind, not visible from the street. max u faxtor .40, lighting to comply with cec 150 (k) | $37,000 |
| May 10, 2011 | Completed final sign-off Mar 2012 | 44 Monterey Bl | change of use from vacant real estate office to new dental office. replace partition walls, install new plumbing and electrical for dental equipments, install new push auto door opener for equivalent facilitation. medical gas system under separate permit.Details
change of use from vacant real estate office to new dental office. replace partition walls, install new plumbing and electrical for dental equipments, install new push auto door opener for equivalent facilitation. medical gas system under separate permit. | $60,000 |
| Jul 26, 2010 | Completed final sign-off Aug 2010 | 565 Dolores St | replace dry-rot lumber & damaged framing & decking to the rear exterior stairway, less than 50%.Details
replace dry-rot lumber & damaged framing & decking to the rear exterior stairway, less than 50%. | $2,800 |
| Jul 12, 2010 | Completed final sign-off Oct 2010 | 758 11th Av | kitchen & bathroom remodeling. replace counter, cabinets, plumbing, electrical fixtures. relocate bathroom & closetDetails
kitchen & bathroom remodeling. replace counter, cabinets, plumbing, electrical fixtures. relocate bathroom & closet | $22,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 106 Peralta Av | bath remodel. replace bath tub and lavatory.Details
bath remodel. replace bath tub and lavatory. | $4,200 |
| May 6, 2010 | Completed final sign-off Jul 2010 | 106 Peralta Av | kitchen remodelling, replace cabinets and counter top at unit #106 first floor. no wall relocation.Details
kitchen remodelling, replace cabinets and counter top at unit #106 first floor. no wall relocation. | $7,600 |
| Jan 7, 2010 | Completed final sign-off Jan 2010 | 1835 08th Av | install 30 anchor bolts. 1 5/8" phase a,b,@4'0 with pl x3x1/4 washer and nut drill and epoxy into e footing. 8" embedrment into concreteDetails
install 30 anchor bolts. 1 5/8" phase a,b,@4'0 with pl x3x1/4 washer and nut drill and epoxy into e footing. 8" embedrment into concrete | $1,600 |
| Aug 6, 2008 | Completed final sign-off Oct 2008 | 3826 Ulloa St | kitchen remodeling. replace cabinets, counter,lights, and plumbing fixtures. 50% of wattage of light fixtures to be fluorescent. no structural work.Details
kitchen remodeling. replace cabinets, counter,lights, and plumbing fixtures. 50% of wattage of light fixtures to be fluorescent. no structural work. | $9,800 |
| Jul 16, 2008 | Completed final sign-off Jul 2008 | 2559 16th Av | replacing front windows in kind. (3) windows same place.Details
replacing front windows in kind. (3) windows same place. | $2,400 |
| Jan 31, 2008 | Completed final sign-off May 2008 | 95 Crestmont Dr | kitchen remodel. replace counter and cabinets, no change in wall and opening layout. min 50% of kitchen lighting wattage must be from flourscent light.Details
kitchen remodel. replace counter and cabinets, no change in wall and opening layout. min 50% of kitchen lighting wattage must be from flourscent light. | $9,400 |
| Jan 19, 2007 | Completed final sign-off Jul 2007 | 3929 23rd St | #3929 only- remodel kitchen, bathroom and sheetrock repair.. cabinets, coutnertop, sink. kitchen: 50% high efficacy lightingDetails
#3929 only- remodel kitchen, bathroom and sheetrock repair.. cabinets, coutnertop, sink. kitchen: 50% high efficacy lighting | $43,000 |
| Nov 8, 2006 | Completed final sign-off Nov 2006 | 3929 23rd St | repair fire damaged on outside stair landing and wall. floor framing and stud walls in area of the (e) laundry room at the lower rear level.Details
repair fire damaged on outside stair landing and wall. floor framing and stud walls in area of the (e) laundry room at the lower rear level. | $8,700 |
| Mar 27, 2006 | Completed final sign-off Aug 2006 | 330 Valdez Av | add bathroom to (e) 2/f,remodel (e)bathroom & kitchen.demo (e)non-structural partition on 1/f. build new bathroom, laundry room, family room, 1 car garage & & 2 bedrooms. all within existing building shell.Details
add bathroom to (e) 2/f,remodel (e)bathroom & kitchen.demo (e)non-structural partition on 1/f. build new bathroom, laundry room, family room, 1 car garage & & 2 bedrooms. all within existing building shell. | $63,000 |
| Mar 3, 2006 | Completed final sign-off Aug 2006 | 330 Valdez Av | 1 kitchen and 1 bathroom remodeling at main floor.Details
1 kitchen and 1 bathroom remodeling at main floor. | $18,200 |
| Aug 24, 2005 | Completed final sign-off Apr 2006 | 2559 16th Av | (1) kitchen & (2) bathrms remolding replace cabs and plumbing fixtures, lights. toilets, ba, sink,Details
(1) kitchen & (2) bathrms remolding replace cabs and plumbing fixtures, lights. toilets, ba, sink, | $23,000 |
| Mar 3, 2005 | Completed final sign-off Jul 2005 | 243 Broad St | remodeling for bedrooms, bathrooms, kitche, sheetrock and taping for whole house. replace doubleDetails
remodeling for bedrooms, bathrooms, kitche, sheetrock and taping for whole house. replace double | $86,000 |
| Jan 7, 2005 | Completed final sign-off Apr 2005 | 40 Valdez Av | kitchen remodel. replace cabinets and counter. refinish ceiling and wall floor. plumb/elec fixtures.Details
kitchen remodel. replace cabinets and counter. refinish ceiling and wall floor. plumb/elec fixtures. | $8,300 |
| Oct 28, 2004 | Completed final sign-off Feb 2005 | 1628 Moraga St | bathroom (1) on main floor, remodeling, reinstall plumbing & electrical fixtures. new sheetrock & tiDetails
bathroom (1) on main floor, remodeling, reinstall plumbing & electrical fixtures. new sheetrock & ti | $8,600 |
| Jul 16, 2004 | Completed final sign-off Nov 2004 | 2055 17th Av | kitchen & bathroom remodling: replace cabinets, countertop, sink. dishwasher. toilet, lavatory, rewiDetails
kitchen & bathroom remodling: replace cabinets, countertop, sink. dishwasher. toilet, lavatory, rewi | $22,000 |
| Jun 24, 2004 | Completed final sign-off Aug 2004 | 463 Amherst St | kitchen remodeling. replace cabinets. rewiring for lights, outlet, replace plumbing fixture & counteDetails
kitchen remodeling. replace cabinets. rewiring for lights, outlet, replace plumbing fixture & counte | $9,600 |
| May 14, 2004 | Completed final sign-off Oct 2004 | 63 Juanita Wy | bathroom remodeling. replace all plumbing and electricalfixtures, refinish wall and floorDetails
bathroom remodeling. replace all plumbing and electricalfixtures, refinish wall and floor | $6,800 |
| Mar 8, 2004 | Completed final sign-off Jun 2004 | 775 28th Av | remodel kitchen-replace counter,cabinets,dryrot at rearside wall at dinning room&concrete foundationDetails
remodel kitchen-replace counter,cabinets,dryrot at rearside wall at dinning room&concrete foundation | $27,600 |
| Nov 5, 2003 | Completed final sign-off Feb 2004 | 1035 Monterey Bl | kitchen remodel, replace cabinets & counter.Details
kitchen remodel, replace cabinets & counter. | $18,000 |
| Sep 23, 2003 | Completed final sign-off Sep 2003 | 530 42nd Av | repair dryrot wood stair center light well less than 50%.Details
repair dryrot wood stair center light well less than 50%. | $2,200 |
| Jun 4, 2003 | Completed final sign-off Sep 2003 | 2468 34th Av | replace kitchen counter and cabinetsDetails
replace kitchen counter and cabinets | $9,200 |
| May 30, 2003 | Completed final sign-off Jun 2003 | 3795 Market St | to revise appl#200305164886 replace wood deck at rear side of house since repair exceeds 50%Details
to revise appl#200305164886 replace wood deck at rear side of house since repair exceeds 50% | $3,600 |
| May 16, 2003 | Completed final sign-off Jun 2003 | 3795 Market St | repair wood deck at rear side. replace dryrot post and josit. deck at rear side in kind repairDetails
repair wood deck at rear side. replace dryrot post and josit. deck at rear side in kind repair | $3,600 |
| Mar 4, 2002 | Completed final sign-off Apr 2002 | 201 Raymond Av | repair garage door/replace sill wood at garage side wall/stucco refinishDetails
repair garage door/replace sill wood at garage side wall/stucco refinish | $7,000 |
| Oct 17, 2001 | Expired or cancelled expired May 2002 | 749 Lakeview Av | wood deck at rear of bldgDetails
wood deck at rear of bldg | $4,000 |
| Jul 9, 2001 | Completed final sign-off Oct 2001 | 1160 Clayton St | replace kitchen counter & cabinetsDetails
replace kitchen counter & cabinets | $4,600 |
| Aug 2, 2000 | Completed final sign-off Sep 2000 | 3024 California St | replacement of existing deck and stairs within rear yardDetails
replacement of existing deck and stairs within rear yard | $500 |
| Jul 10, 2000 | Completed final sign-off Sep 2000 | 3024 California St | replace dry rot siding & repair wood deckcDetails
replace dry rot siding & repair wood deckc | $4,600 |
| Mar 3, 2000 | Completed final sign-off Jun 2000 | 735 Darien Wy | remodel bathroom, replace all plumbing,electrical fixtures, tile & drywallDetails
remodel bathroom, replace all plumbing,electrical fixtures, tile & drywall |