Back to bathroom remodel contractors
Amador General Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2017 to Aug 2026
- Last 24 months
- 10 permits filed
32 permits since 2000: 19 completed, 11 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
9 bathroom remodel permits: 4 completed, 5 in progress. Typically 52 days from filing to permit and 620 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Apr 2026 | 4150 17th St | interior remodel of kitchen and two bathrooms; no changes to the interior walls. all windows being replaced. electrical & plumbing modifications. no mechanical changes proposed.Details
interior remodel of kitchen and two bathrooms; no changes to the interior walls. all windows being replaced. electrical & plumbing modifications. no mechanical changes proposed. | $20,000 |
| Nov 18, 2025 | In progress issued Jan 2026 | 116 Delmar St | revision to pa # 2025-0825-3833. reconfiguration of approved 3rd fl bathroom. addition of an indoor sauna space and a storage/equipment room. no plumbing fixture increase.Details
revision to pa # 2025-0825-3833. reconfiguration of approved 3rd fl bathroom. addition of an indoor sauna space and a storage/equipment room. no plumbing fixture increase. | $15,000 |
| Sep 12, 2025 | In progress issued Oct 2025 | 261 Waller St | install interior staircase. lower level buildout bathroom, bedroom, laundry room and flex space. add exterior deck upstairs. add new skylights.Details
install interior staircase. lower level buildout bathroom, bedroom, laundry room and flex space. add exterior deck upstairs. add new skylights. | $100,000 |
| Aug 25, 2025 | In progress issued Aug 2025 | 116 Delmar St | interior remodel of e 2 story over basement, partial attic conversion including 1 library space, 1 finished attic space and 1 bath. all e windows to remain. 1 new window at 1st fl back kitchen, 1 new slider in at attic conversion to roof deck, 2 new skylights. e ext finishes remain. roof sep permit.Details
interior remodel of e 2 story over basement, partial attic conversion including 1 library space, 1 finished attic space and 1 bath. all e windows to remain. 1 new window at 1st fl back kitchen, 1 new slider in at attic conversion to roof deck, 2 new skylights. e ext finishes remain. roof sep permit. | $600,000 |
| Jun 20, 2024 | In progress issued Apr 2025 | 2101 Turk Bl | remodel (e) home owner office to (n) adu, per ca state law, government code section 65852.2. (n) unit(2101a) included bedroom. bathroom and kitchen. (n) adu is built within (e) building footprint; increase dwelling unit count from 3 to 4, dmj 05/31/2024;Details
remodel (e) home owner office to (n) adu, per ca state law, government code section 65852.2. (n) unit(2101a) included bedroom. bathroom and kitchen. (n) adu is built within (e) building footprint; increase dwelling unit count from 3 to 4, dmj 05/31/2024; | $65,000 |
| Jun 28, 2023 | Completed final sign-off Dec 2025 | 2765 Filbert St | remodel kitchen, 2 bathrooms & interior space.Details
remodel kitchen, 2 bathrooms & interior space. | $250,000 |
| Aug 9, 2022 | Completed final sign-off Aug 2023 | 85 San Jacinto Wy | kitchen and 3 bath remodel. remodel washer dryer room. new sub panelDetails
kitchen and 3 bath remodel. remodel washer dryer room. new sub panel | $68,000 |
| Sep 3, 2021 | Completed final sign-off Nov 2023 | 126 Noe St | remodel extg bathroom into 2 new bathrooms. remodel extg family room.Details
remodel extg bathroom into 2 new bathrooms. remodel extg family room. | $30,000 |
| Jun 15, 2020 | Completed final sign-off Dec 2023 | 2441 Folsom St | remodel kitchens, remove/reconfigure interior walls and add structural support, remodel bathrooms, lightwell infill, remove fireplacesDetails
remodel kitchens, remove/reconfigure interior walls and add structural support, remodel bathrooms, lightwell infill, remove fireplaces | $200,000 |