Back to bathroom remodel contractors
Alvas Construction
- Based in
- Daly City
- On San Francisco permits
- Mar 2007 to Oct 2023
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2020 | Completed final sign-off Jul 2021 | 232 London St | kitchen & bathroom remodeling. two walls to be removed in bothDetails
kitchen & bathroom remodeling. two walls to be removed in both | $25,000 |
| Sep 1, 2020 | Never finaled issued Sep 2020, no final | 637 Powell St | apt 202: remodel kitchen: new cabinets, countertops, sink and applicanes. remodel bathroom, new vanity, sink, tile floor.Details
apt 202: remodel kitchen: new cabinets, countertops, sink and applicanes. remodel bathroom, new vanity, sink, tile floor. | $32,000 |
| Aug 6, 2014 | Completed final sign-off Oct 2014 | 28 Coso Av | bathroom remodel - new faucet, new vanity, new tile walls arount tub and flooring. kitchen - new cabinets and counter tp. no electrical involved.Details
bathroom remodel - new faucet, new vanity, new tile walls arount tub and flooring. kitchen - new cabinets and counter tp. no electrical involved. | $9,700 |