Permit GraphShortlistSan Francisco building permits since 2000

Alonzo Construction

Contractor license
913875
State license record
Based in
San Francisco
On San Francisco permits
Mar 2011 to Jun 2026
Last 24 months
3 permits filed

34 permits since 2000: 23 completed, 1 in progress, 9 never finaled, 1 expired or cancelled.

Of the 9 never-finaled permits, 6 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllStairs 1Kitchen remodel 16Bathroom remodel 22

22 bathroom remodel permits: 14 completed, 7 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 157 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 14, 2026Completed
final sign-off Sep 2026
154 Jasper Plremodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel.
Details
Permit
202604149400
Status
complete
Filed
Apr 14, 2026
Permit issued
Apr 14, 2026
Final sign-off
Sep 16, 2026
Declared cost
$48,000
Address
154 Jasper Pl

remodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel.

Open the permit page

$48,000
Mar 20, 2025Completed
final sign-off Jul 2025
370 23rd Avunit 7: remodel 1 full bathroom in kind. no moving walls.(layout remain) unit 12: remodel 1 full bathroom in kind. no moving walls. (layout remain) each bathroom approx. 35 sq ft.
Details
Permit
202503202675
Status
complete
Filed
Mar 20, 2025
Permit issued
Apr 30, 2025
Final sign-off
Jul 3, 2025
Declared cost
$26,000
Address
370 23rd Av

unit 7: remodel 1 full bathroom in kind. no moving walls.(layout remain) unit 12: remodel 1 full bathroom in kind. no moving walls. (layout remain) each bathroom approx. 35 sq ft.

Open the permit page

$26,000
Apr 20, 2023Never finaled
issued May 2023, no final
1271 20th Av3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joist
Details
Permit
202304206124
Status
issued
Filed
Apr 20, 2023
Permit issued
May 31, 2023
Declared cost
$288,000
Address
1271 20th Av

3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joist

Open the permit page

$288,000
Jan 31, 2023Never finaled
issued Jan 2023, no final
1271 20th Avremodel a full bathroom in kind.
Details
Permit
202301311116
Status
issued
Filed
Jan 31, 2023
Permit issued
Jan 31, 2023
Declared cost
$12,000
Address
1271 20th Av

remodel a full bathroom in kind.

Open the permit page

$12,000
May 2, 2022Never finaled
filed May 2022, never issued
1482 Underwood Avcomply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611: add a 150 sq ft. 1 bed w/ half bathroom in the rear.
Details
Permit
202205023413
Status
filed
Filed
May 2, 2022
Declared cost
$35,000
Address
1482 Underwood Av

comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611: add a 150 sq ft. 1 bed w/ half bathroom in the rear.

Open the permit page

$35,000
Nov 16, 2021Completed
final sign-off Nov 2022
2114 Mission St2/f common area bathroom, remodel shower; 3/f common area bathroom, remodel shower and isntall new exhaust fan; cap an abandones exhaust duct in alleyway (clarion); replace (e) water heater in kind; replace electrical subpanel cover, located on g/f. to comply to nov202183358.
Details
Permit
202111162547
Status
complete
Filed
Nov 16, 2021
Permit issued
Nov 16, 2021
Final sign-off
Nov 9, 2022
Declared cost
$25,000
Address
2114 Mission St

2/f common area bathroom, remodel shower; 3/f common area bathroom, remodel shower and isntall new exhaust fan; cap an abandones exhaust duct in alleyway (clarion); replace (e) water heater in kind; replace electrical subpanel cover, located on g/f. to comply to nov202183358.

Open the permit page

$25,000
Nov 15, 2021Never finaled
filed Nov 2021, never issued
2114 Mission Stwork to comply with nov 202183358. 1. install bathroom exhaust fan in 3rd floor bathroom. 2. replace existing water heater. 3. remodel existing 2nd and 3rd floor showers. 4. cap an abandoned exhaust duct in alleyway. 5. replace subpanel cover with a new one located on ground floor. 6.(cont. in comm)
Details
Permit
202111152435
Status
filed
Filed
Nov 15, 2021
Declared cost
$25,000
Address
2114 Mission St

work to comply with nov 202183358. 1. install bathroom exhaust fan in 3rd floor bathroom. 2. replace existing water heater. 3. remodel existing 2nd and 3rd floor showers. 4. cap an abandoned exhaust duct in alleyway. 5. replace subpanel cover with a new one located on ground floor. 6.(cont. in comm)

Open the permit page

$25,000
Oct 13, 2021Never finaled
issued Jan 2022, no final
64 Lawrence Avto comply with nov#202173806. 1st fl: legalized two bedrooms, media room & bath as per plan. 2nd fl: remodel (e) kitchen & bath, replace dry wall & installation throughtout the bldg. replace fire damaged joists/walls if needed.
Details
Permit
202110130417
Status
issued
Filed
Oct 13, 2021
Permit issued
Jan 26, 2022
Declared cost
$80,000
Address
64 Lawrence Av

to comply with nov#202173806. 1st fl: legalized two bedrooms, media room & bath as per plan. 2nd fl: remodel (e) kitchen & bath, replace dry wall & installation throughtout the bldg. replace fire damaged joists/walls if needed.

Open the permit page

$80,000
Jul 20, 2021Completed
final sign-off Jan 2022
3443 Taraval St1st fl. remodel 1 kitchen, 1 bath, new sub-panel, new windows visible from street 2nd fl. remodel 1 kithcen, 1 full bath, new sub pane, new windwos visible from street
Details
Permit
202107204700
Status
complete
Filed
Jul 20, 2021
Permit issued
Jul 20, 2021
Final sign-off
Jan 27, 2022
Declared cost
$60,000
Address
3443 Taraval St

1st fl. remodel 1 kitchen, 1 bath, new sub-panel, new windows visible from street 2nd fl. remodel 1 kithcen, 1 full bath, new sub pane, new windwos visible from street

Open the permit page

$60,000
Oct 17, 2020Completed
final sign-off Jun 2021
2458 29th Av1st floor: add 2 bedroom & 1.5 bath with media room. 2nd floor: remodel bedroom, add 1 full bath
Details
Permit
202010176744
Status
complete
Filed
Oct 17, 2020
Permit issued
Dec 24, 2020
Final sign-off
Jun 1, 2021
Declared cost
$80,000
Address
2458 29th Av

1st floor: add 2 bedroom & 1.5 bath with media room. 2nd floor: remodel bedroom, add 1 full bath

Open the permit page

$80,000
Oct 7, 2020Never finaled
issued Oct 2020, no final
2458 29th Avremodel an extg bathroom with bathtub like for like.
Details
Permit
202010076094
Status
issued
Filed
Oct 7, 2020
Permit issued
Oct 7, 2020
Declared cost
$13,500
Address
2458 29th Av

remodel an extg bathroom with bathtub like for like.

Open the permit page

$13,500
Sep 30, 2020Completed
final sign-off Oct 2020
26 Spofford Stinstall bathroom exhaust fan at 3rd fl common restroom thru roof. no layout change, no fire alarm/sprinkler modification. comply w/ his nov 202046981.
Details
Permit
202009305557
Status
complete
Filed
Sep 30, 2020
Permit issued
Sep 30, 2020
Final sign-off
Oct 19, 2020
Declared cost
$100
Address
26 Spofford St

install bathroom exhaust fan at 3rd fl common restroom thru roof. no layout change, no fire alarm/sprinkler modification. comply w/ his nov 202046981.

Open the permit page

$100
Jun 29, 2020Completed
final sign-off Jan 2021
119 Lobos St1st fl: add 1 bedroom, 1 full bath, family room and office. 2nd fl: remodel bedrooms, kitchen and bathroom. add 1 full bath. infill at rear
Details
Permit
202006299345
Status
complete
Filed
Jun 29, 2020
Permit issued
Sep 23, 2020
Final sign-off
Jan 15, 2021
Declared cost
$50,000
Address
119 Lobos St

1st fl: add 1 bedroom, 1 full bath, family room and office. 2nd fl: remodel bedrooms, kitchen and bathroom. add 1 full bath. infill at rear

Open the permit page

$50,000
Jun 8, 2020Completed
final sign-off Jan 2021
119 Lobos Stkitchen and bathroom remodel. kitchen: new floor tiles, new cabinets, countertops, sink, faucet, range fan, light,. bathroom: new floor tiles, shower faucet, shower tiles, shower door, vanity sink, mirror, light, fan. all work in kind.
Details
Permit
202006088222
Status
complete
Filed
Jun 8, 2020
Permit issued
Jun 10, 2020
Final sign-off
Jan 15, 2021
Declared cost
$22,000
Address
119 Lobos St

kitchen and bathroom remodel. kitchen: new floor tiles, new cabinets, countertops, sink, faucet, range fan, light,. bathroom: new floor tiles, shower faucet, shower tiles, shower door, vanity sink, mirror, light, fan. all work in kind.

Open the permit page

$22,000
Jan 31, 2020Completed
final sign-off Aug 2020
152 Jasper Plremodel e kitchen and e bath, add 1 new poweder room
Details
Permit
202001313313
Status
complete
Filed
Jan 31, 2020
Permit issued
Feb 7, 2020
Final sign-off
Aug 27, 2020
Declared cost
$22,000
Address
152 Jasper Pl

remodel e kitchen and e bath, add 1 new poweder room

Open the permit page

$22,000
Jan 7, 2020Completed
final sign-off Apr 2020
2789 35th Avremodel one bathroom on the 2nd floor. no alteration of walls. window and door. no structural work under this permit.
Details
Permit
202001071385
Status
complete
Filed
Jan 7, 2020
Permit issued
Jan 7, 2020
Final sign-off
Apr 2, 2020
Declared cost
$9,000
Address
2789 35th Av

remodel one bathroom on the 2nd floor. no alteration of walls. window and door. no structural work under this permit.

Open the permit page

$9,000
Jul 30, 2019Completed
final sign-off Oct 2020
1243 Silver Av1) remove (e) powder room on 1/f per plan. 2) add 1 bathroom, 1 guest room and 1 laundry on 1/f per plans. maher n/a.
Details
Permit
201907307354
Status
complete
Filed
Jul 30, 2019
Permit issued
Aug 26, 2019
Final sign-off
Oct 13, 2020
Declared cost
$7,000
Address
1243 Silver Av

1) remove (e) powder room on 1/f per plan. 2) add 1 bathroom, 1 guest room and 1 laundry on 1/f per plans. maher n/a.

Open the permit page

$7,000
Apr 16, 2019Completed
final sign-off Aug 2019
1654 Greenwich Stremodel kitchen at 3rd floor (100 sq ft). remodel (1) full bathroom and (1) half bathroom at 3rd floor (40 sq ft and 30 sq ft respectively). convert existing storage into laundry room at third floor. lighting per 2016 cenc 150.0(k).
Details
Permit
201904168140
Status
complete
Filed
Apr 16, 2019
Permit issued
Apr 16, 2019
Final sign-off
Aug 27, 2019
Declared cost
$28,000
Address
1654 Greenwich St

remodel kitchen at 3rd floor (100 sq ft). remodel (1) full bathroom and (1) half bathroom at 3rd floor (40 sq ft and 30 sq ft respectively). convert existing storage into laundry room at third floor. lighting per 2016 cenc 150.0(k).

Open the permit page

$28,000
Apr 1, 2019Expired or cancelled
cancelled May 2022
1482 Underwood Avcomply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611. remove non-permitted rear 1-story addition & legalize (e) half bath.
Details
Permit
201904016737
Status
cancelled
Filed
Apr 1, 2019
Permit issued
Apr 29, 2021
Declared cost
$8,000
Address
1482 Underwood Av

comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611. remove non-permitted rear 1-story addition & legalize (e) half bath.

Open the permit page

$8,000
May 21, 2018Completed
final sign-off Sep 2018
479 20th Avto comply with complaint 201859873 remodel (e) kitchen/bath rm remove partial interior wall and install beam at 3rd flr ceiling
Details
Permit
201805219638
Status
complete
Filed
May 21, 2018
Permit issued
May 24, 2018
Final sign-off
Sep 4, 2018
Declared cost
$32,000
Address
479 20th Av

to comply with complaint 201859873 remodel (e) kitchen/bath rm remove partial interior wall and install beam at 3rd flr ceiling

Open the permit page

$32,000
Jan 9, 2018Completed
final sign-off Jul 2019
647 28th Avto comply with nov 201719881 & 201719411 2nd flr - remodel 2 (e) bathrooms and a kitchen 1st flr - add a new bedroom, a family room, 1 full bathroom and a half bath. replacing a beam at the dining room
Details
Permit
201801098221
Status
complete
Filed
Jan 9, 2018
Permit issued
Jan 10, 2018
Final sign-off
Jul 30, 2019
Declared cost
$90,000
Address
647 28th Av

to comply with nov 201719881 & 201719411 2nd flr - remodel 2 (e) bathrooms and a kitchen 1st flr - add a new bedroom, a family room, 1 full bathroom and a half bath. replacing a beam at the dining room

Open the permit page

$90,000
Mar 16, 2011Never finaled
issued Mar 2011, no final
5026 Anza Stremodel two bathrooms, change lighting, new sheetrock, painting. no wall relocation. high efficency lighting or occupancy sensor control, r-13 wall, r-30 ceiling.
Details
Permit
201103162209
Status
issued
Filed
Mar 16, 2011
Permit issued
Mar 16, 2011
Declared cost
$17,000
Address
5026 Anza St

remodel two bathrooms, change lighting, new sheetrock, painting. no wall relocation. high efficency lighting or occupancy sensor control, r-13 wall, r-30 ceiling.

Open the permit page

$17,000