Permit GraphShortlistSan Francisco building permits since 2000

Ally Electric &Solar Inc./Ally Electric

Contractor license
806465
State license record
Based in
Richmond
On San Francisco permits
Sep 2005 to Apr 2026
Last 24 months
6 permits filed

8 permits since 2000: 2 completed, 6 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 7, 2026In progress
issued Apr 2026
268 29th Stsolar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | install new 10 x enphase iq8ac micro inverters with existing qcells modules and remove existing tigo optimi
Details
Permit
S20260407540
Permit issued
Apr 29, 2026

solar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | install new 10 x enphase iq8ac micro inverters with existing qcells modules and remove existing tigo optimi

Open the permit page

Apr 7, 2026In progress
filed Apr 2026, not yet issued
268 29th Stsolar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers, electriq power battery system, and goodwe inverter (located in garage)
Details
Permit
S20260407538

solar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers, electriq power battery system, and goodwe inverter (located in garage)

Open the permit page

$32,900
Apr 7, 2026In progress
filed Apr 2026, not yet issued
268 29th Stsolar permit: installing 10 solar pv modules, 430 watts per module, total no. of rating 4.3 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers,
Details
Permit
S20260407537

solar permit: installing 10 solar pv modules, 430 watts per module, total no. of rating 4.3 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers,

Open the permit page

$32,900
Apr 7, 2026In progress
filed Apr 2026, not yet issued
268 29th Stsolar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers, battery system,& inverter. existing (10) q cells modules to remain an
Details
Permit
S20260407539

solar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | removal of existing tigo optimizers, battery system,& inverter. existing (10) q cells modules to remain an

Open the permit page

$32,900
Mar 5, 2026In progress
issued Mar 2026
829 York Stsolar permit: installing 12 solar pv modules, 405 watts per module, total no. of rating 4.86 kw. mounted: roof, ballasted: n | installation of 4.8kw dc rooftop solar system with modules: 12 × lg solar lg405n2t-j5, 405 w inverters: 12 × enphase iq8plus-72-m-us microin
Details
Permit
S20260303494
Permit issued
Mar 23, 2026

solar permit: installing 12 solar pv modules, 405 watts per module, total no. of rating 4.86 kw. mounted: roof, ballasted: n | installation of 4.8kw dc rooftop solar system with modules: 12 × lg solar lg405n2t-j5, 405 w inverters: 12 × enphase iq8plus-72-m-us microin

Open the permit page

$24,900
Mar 3, 2026In progress
filed Mar 2026, not yet issued
829 York Stsolar permit: installing 12 solar pv modules, 405 watts per module, total no. of rating 4.86 kw. mounted: roof, ballasted: n | installation of 4.8kw dc rooftop solar system with modules: 12 × lg solar lg405n2t-j5, 405 w inverters: 12 × enphase iq8plus-72-m-us microin
Details
Permit
S20260303493

solar permit: installing 12 solar pv modules, 405 watts per module, total no. of rating 4.86 kw. mounted: roof, ballasted: n | installation of 4.8kw dc rooftop solar system with modules: 12 × lg solar lg405n2t-j5, 405 w inverters: 12 × enphase iq8plus-72-m-us microin

Open the permit page

Dec 12, 2023Completed
final sign-off Sep 2024
41 Benton Avinstall 5.880kw dc solar system coupled w/ (2)enphase energy encharge-10t1p-na batteries(total 21kwh). (1)enphase energy system controller 2 (ep200g101-m240us01). (1)enphase iq combiner 4/4c(x-iq-am-240-4). upgrade main electric service to 225 amp w/ 200 amp main breaker, add 60a backup load panel.
Details
Permit
202312122372
Permit issued
Apr 15, 2024
Final sign-off
Sep 3, 2024

install 5.880kw dc solar system coupled w/ (2)enphase energy encharge-10t1p-na batteries(total 21kwh). (1)enphase energy system controller 2 (ep200g101-m240us01). (1)enphase iq combiner 4/4c(x-iq-am-240-4). upgrade main electric service to 225 amp w/ 200 amp main breaker, add 60a backup load panel.

Open the permit page

$53,100
Sep 15, 2005Completed
final sign-off Jan 2006
272 Lexington Stinstall baseboard wall heaters in unit 272 a total 3 in unit 274-a total3 electric
Details
Permit
200509153011
Permit issued
Sep 15, 2005
Final sign-off
Jan 20, 2006

install baseboard wall heaters in unit 272 a total 3 in unit 274-a total3 electric

Open the permit page