Permit GraphShortlistSan Francisco building permits since 2000

Allsite Building Supply Inc

Contractor license
961015
State license record
Based in
Petaluma
On San Francisco permits
Feb 2012 to Jul 2017
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 1Kitchen remodel 2Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 102 days from filing to permit and 304 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 18, 2016Completed
final sign-off May 2018
3 Elizabeth Ststory horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam).
Details
Permit
201607182557
Status
complete
Filed
Jul 18, 2016
Permit issued
Jan 12, 2017
Final sign-off
May 25, 2018
Declared cost
$162,000
Address
3 Elizabeth St

story horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam).

Open the permit page

$162,000
Feb 10, 2012Completed
final sign-off Jun 2012
1962 11th Avremodel kitchen & new bath @ 2nd floor (infill (e) lightwell against adj. property line wall.)
Details
Permit
201202103974
Status
complete
Filed
Feb 10, 2012
Permit issued
Mar 6, 2012
Final sign-off
Jun 25, 2012
Declared cost
$25,000
Address
1962 11th Av

remodel kitchen & new bath @ 2nd floor (infill (e) lightwell against adj. property line wall.)

Open the permit page

$25,000