Allied Propane Service Inc
- Based in
- Richmond
- On San Francisco permits
- Oct 2007 to Mar 2014
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2014 | Expired or cancelled expired Jan 2016 | 2205 Jennings St | remove and replace propane dispenser with new concrete pad. compliance with ordinance no. 155-13 not required. excavation less than 50 cu.yd.Details
remove and replace propane dispenser with new concrete pad. compliance with ordinance no. 155-13 not required. excavation less than 50 cu.yd. | $3,000 |
| Mar 24, 2009 | Completed final sign-off May 2009 | 1680 Evans Av | upgrade installed existing propane dispenser to meet nfpa 58 and local codes. located in open space at rear of building.Details
upgrade installed existing propane dispenser to meet nfpa 58 and local codes. located in open space at rear of building. | $3,000 |
| Oct 30, 2007 | Expired or cancelled expired Mar 2010 | 125 Bay Shore Bl | install (1) 470 gallon vertical propane tanks for dispensing.Details
install (1) 470 gallon vertical propane tanks for dispensing. | $5,000 |