Back to bathroom remodel contractors
Alliance Contractors
- Based in
- Foster City
- On San Francisco permits
- Dec 2004 to Dec 2005
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2005 | Never finaled issued Oct 2005, no final | 1655 Ortega St | remodel kitchen & bath w/new cabinets, tubsx, counter tops, painting throughout tile floors replace sercvice panel & electrical bring todode also plumbing except no weather head chane or water heater change or furnace changeDetails
remodel kitchen & bath w/new cabinets, tubsx, counter tops, painting throughout tile floors replace sercvice panel & electrical bring todode also plumbing except no weather head chane or water heater change or furnace change | $45,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 234 Roosevelt Wy | kitchen & bathroom remodel at 2nd & 3rd fl.Details
kitchen & bathroom remodel at 2nd & 3rd fl. | $3,500 |
| Aug 1, 2005 | Completed final sign-off Jun 2006 | 404 Naples St | remodel kitchen-cabinets,floor,counter,sink&faucet&paint.bath-vanity,sink top,toilet,tile,tub&paint.Details
remodel kitchen-cabinets,floor,counter,sink&faucet&paint.bath-vanity,sink top,toilet,tile,tub&paint. | $20,000 |
| May 12, 2005 | Completed final sign-off Jun 2005 | 800 Meade Av | replace kitchen tile floor, 2 base cabinet.(e)bath to replace shower valve,vanity,fan,shower,enclosuDetails
replace kitchen tile floor, 2 base cabinet.(e)bath to replace shower valve,vanity,fan,shower,enclosu | $12,500 |
| Apr 19, 2005 | Completed final sign-off Jul 2006 | 3210 Jennings St | remodel kitchen & 2 baths.replace cabinets,sink,toilets,tub,vanity,print,flooring,counters.Details
remodel kitchen & 2 baths.replace cabinets,sink,toilets,tub,vanity,print,flooring,counters. | $33,300 |