All Star Windows
- Based in
- Aromas
- On San Francisco permits
- Feb 2019 to Feb 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2019 | Completed final sign-off May 2019 | 2 Alhambra St | replace all windows (137 - 75 visible/62 non-visible) visible windows to be marvin ultimate aluminum-clad wood w/divided lites at upper sash - all double hung except 21 needed for egress, to be casement w/visual look to match double hung. non-visible windows to be marvin ultrex fb. no other work.Details
replace all windows (137 - 75 visible/62 non-visible) visible windows to be marvin ultimate aluminum-clad wood w/divided lites at upper sash - all double hung except 21 needed for egress, to be casement w/visual look to match double hung. non-visible windows to be marvin ultrex fb. no other work. | $202,000 |