Back to bathroom remodel contractors
All Property Tech Llc.
- Based in
- Hayward
- On San Francisco permits
- Jun 2023 to Apr 2026
- Last 24 months
- 5 permits filed
7 permits since 2000: 3 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 2 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2025 | In progress issued May 2025 | 71 Middlefield Dr | replace flooring, drywall in bathrooms, replace galvanized plumbing line with copper. replace 10 elec outlets. new windows.Details
replace flooring, drywall in bathrooms, replace galvanized plumbing line with copper. replace 10 elec outlets. new windows. | $40,000 |
| Jun 23, 2023 | Completed final sign-off Sep 2023 | 1145 Munich St | bathroom area replace insulation drywalls and ceiling replace shower faucet, shower rub, install toilets, shower doors also minor framing and replace sliding due to water damages. remodel like for like.Details
bathroom area replace insulation drywalls and ceiling replace shower faucet, shower rub, install toilets, shower doors also minor framing and replace sliding due to water damages. remodel like for like. | $16,500 |