Back to bathroom remodel contractors
All-Phase Enterprise
- Based in
- San Bruno
- On San Francisco permits
- Dec 2000 to Jan 2013
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2012 | Completed final sign-off Jan 2013 | 26 Twin Peaks Bl | change out windows, remodel bathroom, paint interior, new electrical panel, 200 amp (seperate permit. total windows to be replace =9, 4 of them are visable to twin peak street.Details
change out windows, remodel bathroom, paint interior, new electrical panel, 200 amp (seperate permit. total windows to be replace =9, 4 of them are visable to twin peak street. | $24,000 |
| Oct 15, 2007 | Completed final sign-off Jan 2008 | 822 38th Av | bath remodel, new tub, tile,vanity, sink. no structural. lighting to be flourecent or on occpancy sensorDetails
bath remodel, new tub, tile,vanity, sink. no structural. lighting to be flourecent or on occpancy sensor | $5,000 |