All-Electric California
- Based in
- San Francisco
- On San Francisco permits
- Nov 2022 to Jan 2026
- Last 24 months
- 2 permits filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2026 | Completed final sign-off Mar 2026 | 264 16th Av | solar permit: installing 20 solar pv modules, 440 watts per module, total no. of rating 8.8 kw. mounted: roof, ballasted: n, including 3 energy storage unit, of 240 vac, with 5 kwh each in capacity, ess units will be closer than 3 feet | install solar array with enphaDetails
solar permit: installing 20 solar pv modules, 440 watts per module, total no. of rating 8.8 kw. mounted: roof, ballasted: n, including 3 energy storage unit, of 240 vac, with 5 kwh each in capacity, ess units will be closer than 3 feet | install solar array with enpha | $45,000 |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 264 16th Av | solar permit: ballasted: n, including 3 energy storage unit, with 5 kwh each in capacity, ess units will be closer than 3 feet |Details
solar permit: ballasted: n, including 3 energy storage unit, with 5 kwh each in capacity, ess units will be closer than 3 feet | | $45,000 |
| Jun 25, 2024 | Completed final sign-off Jul 2024 | 378 27th St | add electrical subpanel at back of the house. replace 2 existing gas water heaters with heat pump water heaters. 1 heat pump water heater for dhw, 1 for existing hydronic heating heat supply. disconnect boiler autofill such that hydronic heating is closed loop not connected to city potable water.Details
add electrical subpanel at back of the house. replace 2 existing gas water heaters with heat pump water heaters. 1 heat pump water heater for dhw, 1 for existing hydronic heating heat supply. disconnect boiler autofill such that hydronic heating is closed loop not connected to city potable water. | $12,400 |
| Nov 3, 2022 | Completed final sign-off Jul 2023 | 590 Greenwich St | install 18-panel pv array on flat roof(7200w total,400 per panel), w/ microinerters, on ironridge mount system. install conduit from roof to meter/main area in basement, install enphase iq combiner box,60a non-fused ac disconnect. all on conduit to 30a solar breaker, placed load-side on (e) 100a...Details
install 18-panel pv array on flat roof(7200w total,400 per panel), w/ microinerters, on ironridge mount system. install conduit from roof to meter/main area in basement, install enphase iq combiner box,60a non-fused ac disconnect. all on conduit to 30a solar breaker, placed load-side on (e) 100a... | $26,000 |