All Brand Windows
- Based in
- San Carlos
- On San Francisco permits
- Aug 2003 to Sep 2003
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2003 | Never finaled issued Sep 2003, no final | 2596 24th Av | replace old sashes of windows. old frame kept inside.total 21 windows.15 in front.Details
replace old sashes of windows. old frame kept inside.total 21 windows.15 in front. | $10,500 |
| Aug 22, 2003 | Completed final sign-off Oct 2003 | 2185 Hayes St | window replacement same size,same style,same quality. (130 windows).Details
window replacement same size,same style,same quality. (130 windows). | $72,102 |