Alizoti Co
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Apr 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2021 | Completed final sign-off Sep 2021 | 225 Naylor St | convert bedroom walk in closet to 2nd bathroom. fill in one door. move one door. rearrange some nonload bearing wood stud walls to widen closet for new bathroom. install wc, shower, bathroom sink, exhaust fan, lights, power outlets as required per code.Details
convert bedroom walk in closet to 2nd bathroom. fill in one door. move one door. rearrange some nonload bearing wood stud walls to widen closet for new bathroom. install wc, shower, bathroom sink, exhaust fan, lights, power outlets as required per code. | $15,000 |
| Aug 7, 2018 | Never finaled issued Aug 2018, no final | 41 Parsons St | waterproof foundation. no structural work. no excavation below bottom footing line.Details
waterproof foundation. no structural work. no excavation below bottom footing line. | $10,000 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 650 Oak St | bathroom remodel 1 new shower pan replace shower valve; shower only, tile floor, install new vanity; maher ord 155-13 naDetails
bathroom remodel 1 new shower pan replace shower valve; shower only, tile floor, install new vanity; maher ord 155-13 na | $8,000 |
| Mar 11, 2016 | Completed final sign-off May 2016 | 2200 Pacific Av | bathroom remodel; demo existing tile, install new ones, replace shower valve with new one.Details
bathroom remodel; demo existing tile, install new ones, replace shower valve with new one. | $9,000 |
| Sep 29, 2015 | Completed final sign-off Dec 2015 | 1967 Pine St | remodel bathroom in kind. replace 1 tub, install new tile, reinstall existing shower fixtures, paintDetails
remodel bathroom in kind. replace 1 tub, install new tile, reinstall existing shower fixtures, paint | $11,000 |
| Jun 17, 2014 | Completed final sign-off Oct 2014 | 191 Christopher Dr | revision to appl #2014.0512.5473 - remove closet @ hallway. maher n/a.Details
revision to appl #2014.0512.5473 - remove closet @ hallway. maher n/a. | |
| May 12, 2014 | Completed final sign-off Oct 2014 | 191 Christopher Dr | remove (e) casework, fixtures & finishes from two (e) bathrooms and kitchen. remove non-strl wall btw kitchen and dining, remodel two (e) bathrooms & kitchen. new casework, fixt & finish. relocate plumbing in kitchen to accommodate new layout & update electrical.Details
remove (e) casework, fixtures & finishes from two (e) bathrooms and kitchen. remove non-strl wall btw kitchen and dining, remodel two (e) bathrooms & kitchen. new casework, fixt & finish. relocate plumbing in kitchen to accommodate new layout & update electrical. | $65,000 |