Back to bathroom remodel contractors
Alioto Centoni Restoration & Dev
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Oct 2012
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2012 | Completed final sign-off Nov 2012 | 735 Union St | revision to appl.#201206213123; replace window along lightwell in-kind & replace 1-double hung w/ casement. remove (e) skylight & replace w/2x10 framing & tar & gravel. add 1-fan @ powder rm. dry-rot repair along the lightwell wall & between bathrooms.Details
revision to appl.#201206213123; replace window along lightwell in-kind & replace 1-double hung w/ casement. remove (e) skylight & replace w/2x10 framing & tar & gravel. add 1-fan @ powder rm. dry-rot repair along the lightwell wall & between bathrooms. | $3,000 |
| Jun 21, 2012 | Completed final sign-off Nov 2012 | 735 Union St | bathroom remodel: change lighting, toilet, vanity, tub faucet and fixtures. tile floor and walls. also powder room, tile, toilet, sink and flooring.Details
bathroom remodel: change lighting, toilet, vanity, tub faucet and fixtures. tile floor and walls. also powder room, tile, toilet, sink and flooring. | $10,000 |
| Sep 22, 2011 | Completed final sign-off Nov 2011 | 4227 24th St | bathroom remodel on ground floor onlyDetails
bathroom remodel on ground floor only | $10,000 |
| May 9, 2011 | Completed final sign-off Jun 2011 | 372 Arguello Bl | remodel (e) bathroom, add 1-fan, 1 outlet & 1-switch.Details
remodel (e) bathroom, add 1-fan, 1 outlet & 1-switch. | $10,000 |
| May 9, 2011 | Completed final sign-off Sep 2011 | 2116 Golden Gate Av | remodel (e) bathroom & powder room, add 1-exhaust fan, 1-switch, 1-outlet.Details
remodel (e) bathroom & powder room, add 1-exhaust fan, 1-switch, 1-outlet. | $10,000 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 2090 Great Hy | one bathroom remodel, non-structural, high efficacy lighting or occupancy sensor.Details
one bathroom remodel, non-structural, high efficacy lighting or occupancy sensor. | $10,000 |
| Jun 30, 2010 | Completed final sign-off Oct 2010 | 127 16th Av | 2-ea. bathroom remodels @ 3rd. flr.; provide exhaust fans, high efficiency lighting on manual on occupancy sensorsDetails
2-ea. bathroom remodels @ 3rd. flr.; provide exhaust fans, high efficiency lighting on manual on occupancy sensors | $20,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 100 Carmel St | remodel bathroom vanities, plumbing, fixtures, tile floor, shower surround.Details
remodel bathroom vanities, plumbing, fixtures, tile floor, shower surround. | $12,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 102 Carmel St | bathroom remodel: vanities, plumbing fixtures, tile floor, shower surround.Details
bathroom remodel: vanities, plumbing fixtures, tile floor, shower surround. | $12,000 |