Alfa Construction
- Based in
- Vallejo
- On San Francisco permits
- Mar 2018 to Aug 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2023 | Completed final sign-off Nov 2023 | 3879 22nd St | unit 1; replacement of seven rear windows in 2nd flr. rental unit. windows are not visable from street or any pedestrian right of way. u-factor <0.30Details
unit 1; replacement of seven rear windows in 2nd flr. rental unit. windows are not visable from street or any pedestrian right of way. u-factor <0.30 | $17,000 |
| Mar 13, 2018 | Completed final sign-off May 2018 | 175 Bluxome St | replace damaged window 4 x 6 in kind, replace sheet rock about 18' x 32', replace shear wall plywood. replace two electric wall heaters with "for air heater" in same location (electrical heat). replace wood flooring, and paint unit. replace window max 0.40 u-factor. no other work. n/a maherDetails
replace damaged window 4 x 6 in kind, replace sheet rock about 18' x 32', replace shear wall plywood. replace two electric wall heaters with "for air heater" in same location (electrical heat). replace wood flooring, and paint unit. replace window max 0.40 u-factor. no other work. n/a maher | $38,000 |