Back to bathroom remodel contractors
Alexander Builders Inc
- Based in
- So. San Francisco
- On San Francisco permits
- Jan 2007 to Feb 2024
- Last 24 months
- 0 permits filed
23 permits since 2000: 19 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2024 | Completed final sign-off Aug 2025 | 860 Joost Av | lower floor (286sf) additon of new bedroom and bathroom. upper level remodel of kitchen and staircase. scope include mechanical, electrical and plumbing work. (2) skylight and relocate laundry.Details
lower floor (286sf) additon of new bedroom and bathroom. upper level remodel of kitchen and staircase. scope include mechanical, electrical and plumbing work. (2) skylight and relocate laundry. | $350,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 850 Colby St | comply with violation #202172332. kitchen and bathroom cabinets, tub, shower pan, sink, toilet on the same location. no structural framing. 6 windows installation(retrofit) 2 back bedrooms, kitchen, dining, and bathroom. all window not visible from the street.Details
comply with violation #202172332. kitchen and bathroom cabinets, tub, shower pan, sink, toilet on the same location. no structural framing. 6 windows installation(retrofit) 2 back bedrooms, kitchen, dining, and bathroom. all window not visible from the street. | $100,000 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 87 Melrose Av | remove load bearing wall @ 2nd fl. remodel existing bathroomDetails
remove load bearing wall @ 2nd fl. remodel existing bathroom | $30,000 |
| May 24, 2017 | Completed final sign-off Aug 2017 | 108 Everson St | convert (e) 2 fixture bath to a 3 fixture bath on 2nd floorDetails
convert (e) 2 fixture bath to a 3 fixture bath on 2nd floor | $12,000 |
| Apr 2, 2015 | Completed final sign-off May 2015 | 553 Frederick St | apt 302: 2 bathrooms remodeling: 1. hall bath: replace all fixtures except tub to existing locations. 2. master bath: replace all fixtures on existing locations. tub to shower pan conversion with seat. no walls & structural work.Details
apt 302: 2 bathrooms remodeling: 1. hall bath: replace all fixtures except tub to existing locations. 2. master bath: replace all fixtures on existing locations. tub to shower pan conversion with seat. no walls & structural work. | $15,000 |
| Jun 20, 2014 | Completed final sign-off Jul 2014 | 389 Warren Dr | 2nd bathroom remodeling: replace sink, toilet, showerpan, faucet, tiles at existing location, approx 35 sq. feetDetails
2nd bathroom remodeling: replace sink, toilet, showerpan, faucet, tiles at existing location, approx 35 sq. feet | $10,000 |
| May 1, 2014 | Completed final sign-off Jul 2014 | 389 Warren Dr | bathroom remodeling, replacement of tub, shower faucet, shower wall tiles, floor tiles & sink at (e) location, no fan & gfi outlet work, replacement of switch & light fixture. 45 sq ft.Details
bathroom remodeling, replacement of tub, shower faucet, shower wall tiles, floor tiles & sink at (e) location, no fan & gfi outlet work, replacement of switch & light fixture. 45 sq ft. | $10,000 |
| Apr 5, 2013 | Never finaled issued Apr 2013, no final | 786 Minna St | remodel bathroom- remove all wall coverings, replace new ceiling covering & tile walls, remove swinging door jamb & replace with surface mount sliding door, replace exhaust fan & install 3 new ceiling lights, relocate gfci outlet, replace tub with pre-fab shower stall, replace double sink.Details
remodel bathroom- remove all wall coverings, replace new ceiling covering & tile walls, remove swinging door jamb & replace with surface mount sliding door, replace exhaust fan & install 3 new ceiling lights, relocate gfci outlet, replace tub with pre-fab shower stall, replace double sink. | $10,000 |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 136 Benton Av | bathroom remodeleeing and dry rot repair. tub to stand up shower converstion, relocation of sink, replacement of exhaust vent, additional recess lights and replacement of tiles. replacement of shower faucet.Details
bathroom remodeleeing and dry rot repair. tub to stand up shower converstion, relocation of sink, replacement of exhaust vent, additional recess lights and replacement of tiles. replacement of shower faucet. | $15,000 |
| Sep 2, 2011 | Completed final sign-off Nov 2012 | 570 Arkansas St | interior remodel:adding 223 s.f. of conditioned space at 1st floor for new guest room and full bath. remodel kitchen and bathroom at 2nd floor. replace rear facing windows with new window and doors per plans. replacement windows at side per plans . add new ceiling framing at kit/dinDetails
interior remodel:adding 223 s.f. of conditioned space at 1st floor for new guest room and full bath. remodel kitchen and bathroom at 2nd floor. replace rear facing windows with new window and doors per plans. replacement windows at side per plans . add new ceiling framing at kit/din | $88,000 |
| Feb 23, 2011 | Completed final sign-off Aug 2011 | 271 Ripley St | revision to approved app #201011084489: toilet, shower, and lavatories in bath room relocated.Details
revision to approved app #201011084489: toilet, shower, and lavatories in bath room relocated. | |
| Apr 9, 2010 | Completed final sign-off Dec 2010 | 448 Utah St | bathroom remodeling-drywall & tile work, provide high efficacy lights per cec 151k, relocate toilet, replace sink & shower. window installation with framing work (smaller window), exhaust fan, recess lights (3) & swithces.Details
bathroom remodeling-drywall & tile work, provide high efficacy lights per cec 151k, relocate toilet, replace sink & shower. window installation with framing work (smaller window), exhaust fan, recess lights (3) & swithces. | $13,500 |
| Apr 24, 2008 | Expired or cancelled expired Sep 2009 | 44 Nevada St | interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights.Details
interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights. | $128,000 |