Back to bathroom remodel contractors
Alex Painting & Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Feb 2024
- Last 24 months
- 0 permits filed
25 permits since 2000: 22 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 88 Robinson Dr | remodel kitchen and bathroom. upgrade electrical main service from 40 amp to 100 amp and upgrade wiring. no removal of walls.Details
remodel kitchen and bathroom. upgrade electrical main service from 40 amp to 100 amp and upgrade wiring. no removal of walls. | $25,000 |
| Jan 6, 2022 | Completed final sign-off Apr 2023 | 49 Crestmont Dr | interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level.Details
interior remodel including kitchen and 2 bathrooms. add cantilevered rear deck <10' afg. reconfigure stair to lower level. | $20,000 |
| Jul 22, 2020 | Completed final sign-off Dec 2020 | 2243 Bay St | add a full bathroom to (e) bedroom.Details
add a full bathroom to (e) bedroom. | $5,000 |
| Sep 16, 2013 | Completed final sign-off Nov 2013 | 12 Eugenia Av | remodel of bathroom & w.c. on 2/f, no change on walls.Details
remodel of bathroom & w.c. on 2/f, no change on walls. | $10,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2013 | 12 Eugenia Av | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $20,000 |
| Jun 20, 2013 | Completed final sign-off Jul 2013 | 206 Lisbon St | comply with nov# 201114781 & 200671923-demolish unpermitted rooms, kitchen & bathroom on ground floor (garage)Details
comply with nov# 201114781 & 200671923-demolish unpermitted rooms, kitchen & bathroom on ground floor (garage) | $1,800 |
| Apr 21, 2011 | Completed final sign-off Jun 2011 | 353 Peninsula Av | upgrade kitchen and two bathrooms on 2nd floorDetails
upgrade kitchen and two bathrooms on 2nd floor | $20,000 |
| Mar 28, 2011 | Completed final sign-off Jun 2011 | 353 Peninsula Av | add family room, bedroom and a full bath room on 1st/garage floorDetails
add family room, bedroom and a full bath room on 1st/garage floor | $30,000 |
| Mar 11, 2011 | Completed final sign-off Dec 2011 | 76 Tioga Av | interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stuccoDetails
interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stucco | $20,000 |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 1362 Jackson St | remodel bathroom, replace kitchen cabinets, replace damaged plaster wall & ceiling. paint interior. upgrade electric wiring & sub panel. refurnish hardwood floor. work at #1362 only.Details
remodel bathroom, replace kitchen cabinets, replace damaged plaster wall & ceiling. paint interior. upgrade electric wiring & sub panel. refurnish hardwood floor. work at #1362 only. | $16,000 |
| Aug 28, 2009 | Completed final sign-off Jan 2010 | 5224 California St | 1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet.Details
1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet. | $65,256 |
| Jan 2, 2008 | Completed final sign-off Apr 2008 | 1530 Mcallister St | work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work.Details
work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work. | $35,000 |