Back to bathroom remodel contractors
Alderson Construction
- Based in
- Berkeley
- On San Francisco permits
- Aug 2000 to Feb 2020
- Last 24 months
- 0 permits filed
7 permits since 2000: 3 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 100 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2015 | Expired or cancelled expired Jul 2022 | 210 Frederick St | add a new dwelling unit of 265 sf at rear of existing building at ground floor with bathroom and kitchen (one studio), and 35 sf deck addition at second floor.Details
add a new dwelling unit of 265 sf at rear of existing building at ground floor with bathroom and kitchen (one studio), and 35 sf deck addition at second floor. | $68,000 |
| Oct 7, 2010 | Completed final sign-off Sep 2011 | 18 06th Av | remodel (e) kitchen, cosmetic repair of bathroom & bathroom cabinetry.Details
remodel (e) kitchen, cosmetic repair of bathroom & bathroom cabinetry. | $75,000 |