Albert General Bldg Contr
- Based in
- Burlingame
- On San Francisco permits
- Apr 2000 to Dec 2005
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 74 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2004 | Completed final sign-off Nov 2004 | 1900 20th St | replace rotted decking 2x6, 2x10 floor joists, repair railing, 6x8 post and stain all three decks. tDetails
replace rotted decking 2x6, 2x10 floor joists, repair railing, 6x8 post and stain all three decks. t | $10,000 |
| Sep 4, 2003 | Completed final sign-off Apr 2004 | 435 Joost Av | build 3'x10' deck &5'x10'/remove window install 5' slidiing vynyl/dual glass sliding door andDetails
build 3'x10' deck &5'x10'/remove window install 5' slidiing vynyl/dual glass sliding door and | $6,500 |