Back to bathroom remodel contractors
Albert Constuction
- Based in
- Hayward
- On San Francisco permits
- Jul 2024 to Jan 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 103 days from filing to permit and 387 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2024 | Completed final sign-off Nov 2025 | 131 Beverly St | revision to 202402156009 2/f: all windows replacement (street facing windows included). (e) bathroom and kitchen remodel, relocate (e) stair and remove stair to the ground floor, remove fireplace. ground floor: add 2 bedrooms, 2 full bathrooms, relocate and renew washer/dryer, furnace, water heater.Details
revision to 202402156009 2/f: all windows replacement (street facing windows included). (e) bathroom and kitchen remodel, relocate (e) stair and remove stair to the ground floor, remove fireplace. ground floor: add 2 bedrooms, 2 full bathrooms, relocate and renew washer/dryer, furnace, water heater. | $150,000 |