Permit GraphShortlistSan Francisco building permits since 2000

Alb Design And Construction

Contractor license
971294
State license record
Based in
Daly City
On San Francisco permits
Nov 2016 to Jun 2026
Last 24 months
2 permits filed

7 permits since 2000: 5 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 3Bathroom remodel 3

3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 363 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 16, 2026In progress
issued Jun 2026
4037 Lawton Stin-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
Details
Permit
202606163365
Status
issued
Filed
Jun 16, 2026
Permit issued
Jun 16, 2026
Declared cost
$22,000
Address
4037 Lawton St

in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).

Open the permit page

$22,000
May 20, 2019Completed
final sign-off Feb 2020
349 South Van Ness Avreplave kitchen cabinets. replace 2 bathroom fixtures, toilet, sink & bath tubs. painting at walls & ceilings. install hard pre engineered floors (no change of (e) floor plan)
Details
Permit
201905201071
Status
complete
Filed
May 20, 2019
Permit issued
May 20, 2019
Final sign-off
Feb 6, 2020
Declared cost
$25,000
Address
349 South Van Ness Av

replave kitchen cabinets. replace 2 bathroom fixtures, toilet, sink & bath tubs. painting at walls & ceilings. install hard pre engineered floors (no change of (e) floor plan)

Open the permit page

$25,000
Nov 22, 2016Completed
final sign-off Nov 2020
718 Morse Stunit legalization per ord #43-14. wall & ceiling framings, sheetrock/drywalls/bathroom & kitchen's repairs in compliance per cbc code, rehabilation of electrical & plumbing, ceiling insulation. (n) inteiror paintings.
Details
Permit
201611223370
Status
complete
Filed
Nov 22, 2016
Permit issued
Aug 14, 2019
Final sign-off
Nov 20, 2020
Declared cost
$36,850
Address
718 Morse St

unit legalization per ord #43-14. wall & ceiling framings, sheetrock/drywalls/bathroom & kitchen's repairs in compliance per cbc code, rehabilation of electrical & plumbing, ceiling insulation. (n) inteiror paintings.

Open the permit page

$36,850
Alb Design And Construction, contractor license 971294 | Permit Graph