Back to bathroom remodel contractors
Alb Design And Construction
- Based in
- Daly City
- On San Francisco permits
- Nov 2016 to Jun 2026
- Last 24 months
- 2 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 363 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 4037 Lawton St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| May 20, 2019 | Completed final sign-off Feb 2020 | 349 South Van Ness Av | replave kitchen cabinets. replace 2 bathroom fixtures, toilet, sink & bath tubs. painting at walls & ceilings. install hard pre engineered floors (no change of (e) floor plan)Details
replave kitchen cabinets. replace 2 bathroom fixtures, toilet, sink & bath tubs. painting at walls & ceilings. install hard pre engineered floors (no change of (e) floor plan) | $25,000 |
| Nov 22, 2016 | Completed final sign-off Nov 2020 | 718 Morse St | unit legalization per ord #43-14. wall & ceiling framings, sheetrock/drywalls/bathroom & kitchen's repairs in compliance per cbc code, rehabilation of electrical & plumbing, ceiling insulation. (n) inteiror paintings.Details
unit legalization per ord #43-14. wall & ceiling framings, sheetrock/drywalls/bathroom & kitchen's repairs in compliance per cbc code, rehabilation of electrical & plumbing, ceiling insulation. (n) inteiror paintings. | $36,850 |