Back to bathroom remodel contractors
Alat Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to May 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2019 | Completed final sign-off Mar 2022 | 445 Francisco St | removing bathtub and installing a shower pan, same location. installing new tiles throughout the bathroom walls and floor. raise existing shower fauce. no stuctural work, comply with cec 150.0(k) 5Details
removing bathtub and installing a shower pan, same location. installing new tiles throughout the bathroom walls and floor. raise existing shower fauce. no stuctural work, comply with cec 150.0(k) 5 | $15,000 |
| Dec 18, 2018 | Completed final sign-off Jan 2019 | 601 Van Ness Av | unit #305 partial remodeling of shower in bathroom:new plumbing and new shower pan. no change in wall and opening layoutDetails
unit #305 partial remodeling of shower in bathroom:new plumbing and new shower pan. no change in wall and opening layout | $7,350 |
| Nov 20, 2015 | Completed final sign-off Jun 2016 | 3451 Jackson St | replace old kitchen cabinets with new cabinets, counter, flooring, convert laundry to bathroom, shower stall, toilet , sink. remodel 4 bathrooms, new tile, flooring, vanity, toilet. n/a maher ordinanceDetails
replace old kitchen cabinets with new cabinets, counter, flooring, convert laundry to bathroom, shower stall, toilet , sink. remodel 4 bathrooms, new tile, flooring, vanity, toilet. n/a maher ordinance | $200,000 |