Back to bathroom remodel contractors
Ajp General Construction
- Based in
- San Pablo
- On San Francisco permits
- Jun 2023 to Jul 2026
- Last 24 months
- 13 permits filed
29 permits since 2000: 18 completed, 10 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 7 completed, 6 in progress. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | In progress issued May 2026 | 849 Divisadero St | unit 4: kitchen and bathroom remodel, new finishes, upgrade electrical and plumbing. no change in plumbing fixture count, no wall demolition or construction.Details
unit 4: kitchen and bathroom remodel, new finishes, upgrade electrical and plumbing. no change in plumbing fixture count, no wall demolition or construction. | $80,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 795 Clayton St | apt a: kitchen and bathroom remodel in kind. install new kitchen cabinet and toilet.Details
apt a: kitchen and bathroom remodel in kind. install new kitchen cabinet and toilet. | $55,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 126 Cole St | revision to bpa 202310269539 new owner, change aor, eor. rear addition to 1 story wood deck. no 4th floor dormer; ground floor - foundation & framing upgrades; 2nd fl - add powder, kitchen remodel. change windows; 3rd fl add bathDetails
revision to bpa 202310269539 new owner, change aor, eor. rear addition to 1 story wood deck. no 4th floor dormer; ground floor - foundation & framing upgrades; 2nd fl - add powder, kitchen remodel. change windows; 3rd fl add bath | |
| May 8, 2025 | Completed final sign-off Jul 2025 | 814 14th St | (1) kitchen and (1) bathroom remodel like for like, new electrical wiring in kitchen and bathroomDetails
(1) kitchen and (1) bathroom remodel like for like, new electrical wiring in kitchen and bathroom | $55,000 |
| Mar 25, 2025 | Completed final sign-off May 2025 | 795 Burnett Av | unit #12: replace kitchen cabinets in kind. bathroom remodeling in kind - replace toilet, sink, bath tub, shower valve (trims) in kind. relocate electrical panel and new wiring up to code in kitchen and bathroom. no change to floor layout. no change to wall layout. no structural work.Details
unit #12: replace kitchen cabinets in kind. bathroom remodeling in kind - replace toilet, sink, bath tub, shower valve (trims) in kind. relocate electrical panel and new wiring up to code in kitchen and bathroom. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Nov 26, 2024 | In progress issued Nov 2024 | 765 Burnett Av | apt 12: kitchen and bathroom remodeling. (install new cabinets in kind, new electrical up to code, new tile in bathroom shower walls, new toilet, sink and shower valve), no wall demolition or construction, no change in plumbing fixture count.Details
apt 12: kitchen and bathroom remodeling. (install new cabinets in kind, new electrical up to code, new tile in bathroom shower walls, new toilet, sink and shower valve), no wall demolition or construction, no change in plumbing fixture count. | $45,000 |
| May 23, 2024 | In progress issued May 2024 | 1725 Taylor St | apt 1a: replace kitchen cabinets in kind, new toilet, sink, bathtub, shower pan in kind. new tile in 2 bathrooms, relocate electrical panel and new wiring in kitchen and 2 bathrooms.Details
apt 1a: replace kitchen cabinets in kind, new toilet, sink, bathtub, shower pan in kind. new tile in 2 bathrooms, relocate electrical panel and new wiring in kitchen and 2 bathrooms. | $50,000 |
| Apr 24, 2024 | Completed final sign-off Jul 2024 | 21 Beulah St | comply w/ nov #200559527 #3 to 8: new kitchen cabinets, remodel one bathroom install new electrical wiring and new plumbing, bathtub, toilet, sin (bathroom & kitchen) and toilet room replace toilet in kind and laundryDetails
comply w/ nov #200559527 #3 to 8: new kitchen cabinets, remodel one bathroom install new electrical wiring and new plumbing, bathtub, toilet, sin (bathroom & kitchen) and toilet room replace toilet in kind and laundry | $85,000 |
| Apr 8, 2024 | Completed final sign-off May 2024 | 849 Divisadero St | apt 1: new electrical , install a subpanel, replace in kind toilet, bathroom sink, install new tile in bath area, replace kitchen cabinets.Details
apt 1: new electrical , install a subpanel, replace in kind toilet, bathroom sink, install new tile in bath area, replace kitchen cabinets. | $45,000 |
| Nov 13, 2023 | Completed final sign-off Feb 2024 | 765 Burnett Av | unit #9: replace kitchen cabinets, new electrical wiring in kitchen & bathroom, replace toilet, bath sink, bathtub, shower valve in kindDetails
unit #9: replace kitchen cabinets, new electrical wiring in kitchen & bathroom, replace toilet, bath sink, bathtub, shower valve in kind | $45,000 |
| Oct 30, 2023 | Completed final sign-off Feb 2024 | 755 Burnett Av | unit 7: replace kitchen cabinets, replace electric in kitchen and bath. replace toilet, kitchen sink, bath sink.Details
unit 7: replace kitchen cabinets, replace electric in kitchen and bath. replace toilet, kitchen sink, bath sink. | $45,000 |
| Oct 18, 2023 | In progress issued Oct 2023 | 777 Cole St | apt 2: demo and install new shower tile and replace bathtub and shower valve, install new gfci at existing wiring in bathroom, remodel in-kindDetails
apt 2: demo and install new shower tile and replace bathtub and shower valve, install new gfci at existing wiring in bathroom, remodel in-kind | $12,000 |
| Jun 29, 2023 | Completed final sign-off Sep 2023 | 702 Ashbury St | remodeling one (e) kitchen (new cabs & electrical & plumbing fixtures). kitchen sink. remodel one bathroom: replace tub shower valve, toilet, and bathroom sink.Details
remodeling one (e) kitchen (new cabs & electrical & plumbing fixtures). kitchen sink. remodel one bathroom: replace tub shower valve, toilet, and bathroom sink. | $65,000 |