Back to bathroom remodel contractors
Aho Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Feb 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 7 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2017 | Completed final sign-off Feb 2018 | 100 Florentine Av | add 2 bedrooms, 2 full baths, entertainment, office, mud room, storage and 1 powder rm on (garage level)1st fl per planDetails
add 2 bedrooms, 2 full baths, entertainment, office, mud room, storage and 1 powder rm on (garage level)1st fl per plan | $45,000 |
| Apr 16, 2013 | Expired or cancelled expired Jan 2018 | 115 Lowell St | 1st floor: remove & replace (e) damaged/cracked concrete slab, add one (n) bedroom w/full bath, one family room & entertainment room w/full bath, legalize (e) office. 2nd floor: add one bath & remodel (e) bath, add a (n) bedroom, add skylight in the hallway & bathrooms.add continuous exhuast fans.Details
1st floor: remove & replace (e) damaged/cracked concrete slab, add one (n) bedroom w/full bath, one family room & entertainment room w/full bath, legalize (e) office. 2nd floor: add one bath & remodel (e) bath, add a (n) bedroom, add skylight in the hallway & bathrooms.add continuous exhuast fans. | $135,000 |
| Apr 4, 2013 | Completed final sign-off Aug 2013 | 2801 Sacramento St | unit #1-remove (e) kitchen cabinets, install new cabinets, sink & fuacet. remove (e) bathtub, water closet & faucet. install new bathtub, new water closet, new faucet. remove (e) bathroom shower faucet & water closet. install new shoer faucet & water closetDetails
unit #1-remove (e) kitchen cabinets, install new cabinets, sink & fuacet. remove (e) bathtub, water closet & faucet. install new bathtub, new water closet, new faucet. remove (e) bathroom shower faucet & water closet. install new shoer faucet & water closet | $10,000 |
| Dec 3, 2010 | Completed final sign-off Jun 2011 | 722 Vienna St | interior room additoins, all in ground level behind the garage space, add one bedroom, one family room & one bathroom.Details
interior room additoins, all in ground level behind the garage space, add one bedroom, one family room & one bathroom. | $20,000 |
| Feb 8, 2010 | Completed final sign-off Mar 2010 | 940 Powell St | bathroom remodel: remove (e) bathtub & faucet, replace bathtub & faucet in kind, replace tiles (small area about 2ft). no moving or adding walls. no lightinh work.Details
bathroom remodel: remove (e) bathtub & faucet, replace bathtub & faucet in kind, replace tiles (small area about 2ft). no moving or adding walls. no lightinh work. | $1,100 |