Advanced Window Systems
- Based in
- Belmont
- On San Francisco permits
- Apr 2011 to May 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2011 | Completed final sign-off Sep 2011 | 279 Oak Park Dr | remove and replace one patio door size for size same location, not visible from streetDetails
remove and replace one patio door size for size same location, not visible from street | $2,300 |
| Apr 22, 2011 | Completed final sign-off Jul 2011 | 121 Mateo St | remove and replace five windows size to size same location at front, wood clad fibrex (not vinyl). all to be double hung. u-factor of windows not to exceed 0.40.Details
remove and replace five windows size to size same location at front, wood clad fibrex (not vinyl). all to be double hung. u-factor of windows not to exceed 0.40. | $3,000 |