Adobe Interiors
- Based in
- Ben Lomond
- On San Francisco permits
- Dec 2012 to Sep 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2019 | Completed final sign-off Nov 2019 | 29 Turquoise Wy | 1) master bath remodel: plumbing, electrical, hot mop shower. 2)electrical master bath, master bedroom, living room. 3)new sheet rock at above location. glazing windows.Details
1) master bath remodel: plumbing, electrical, hot mop shower. 2)electrical master bath, master bedroom, living room. 3)new sheet rock at above location. glazing windows. | $70,000 |
| Feb 7, 2018 | Completed final sign-off Jun 2018 | 29 Turquoise Wy | remodel kitchen & bathroom, new lighting, electrical, plumbing,s heetrock new layout @ kitchen, bathroom layout to remain the same, new tub fixture, tile, install 2-windows, 2-skylights, door slider, all to be replaced in-kind.Details
remodel kitchen & bathroom, new lighting, electrical, plumbing,s heetrock new layout @ kitchen, bathroom layout to remain the same, new tub fixture, tile, install 2-windows, 2-skylights, door slider, all to be replaced in-kind. | $50,000 |
| Jul 24, 2015 | Completed final sign-off Sep 2017 | 77 Dow Pl | general remodel of bathroom. remove (e) tub & replace with shower unit. redo floor & vanity. no walls to be altered or removed.Details
general remodel of bathroom. remove (e) tub & replace with shower unit. redo floor & vanity. no walls to be altered or removed. | $15,000 |
| Dec 6, 2012 | Completed final sign-off Oct 2013 | 601 04th St | extend (e) mezzanine & add (1) bathroom. construct (n) mezzanine remodel kitchen. plumbing & electrical under separate permit. sprinkler permit under seperate permit.Details
extend (e) mezzanine & add (1) bathroom. construct (n) mezzanine remodel kitchen. plumbing & electrical under separate permit. sprinkler permit under seperate permit. | $25,000 |