Back to bathroom remodel contractors
Acer-G Engineering
- Based in
- San Francisco
- On San Francisco permits
- Mar 2025 to Jul 2026
- Last 24 months
- 17 permits filed
17 permits since 2000: 7 completed, 10 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 in progress. Typically 19 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 1070 Pacific Av | inkind kitchen and bathroom remodel. refresh sheetrock & insulation @ 2 bedrooms on 2/f. (use 5/8" gyp-x)Details
inkind kitchen and bathroom remodel. refresh sheetrock & insulation @ 2 bedrooms on 2/f. (use 5/8" gyp-x) | $7,500 |
| Mar 11, 2026 | In progress issued Mar 2026 | 45 Dalewood Wy | remodel existing kitchen and bathrooms; remove wall at dining; new closet at entry.Details
remodel existing kitchen and bathrooms; remove wall at dining; new closet at entry. | $89,000 |
| Dec 1, 2025 | In progress issued Apr 2026 | 271 23rd Av | new dwelling unit adu per ca government code section 65852.2 at 1/f modify (e) unconditioned space into adu (271a) includes new bedrooms, bathroom, dining and kitchen.Details
new dwelling unit adu per ca government code section 65852.2 at 1/f modify (e) unconditioned space into adu (271a) includes new bedrooms, bathroom, dining and kitchen. | $159,000 |
| Aug 29, 2025 | In progress issued Sep 2025 | 271 23rd Av | 1/fl- remodel (e) floor space with (n) walls, door and windows and replace (e) garage door with 9 foot door. 2nd/fl remodel (e) bath and kitchen and add (n) bathroom. no changes to (e) windows on front facade.Details
1/fl- remodel (e) floor space with (n) walls, door and windows and replace (e) garage door with 9 foot door. 2nd/fl remodel (e) bath and kitchen and add (n) bathroom. no changes to (e) windows on front facade. | $132,000 |