Ace Plumbing & Rooter
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Aug 2026
- Last 24 months
- 7 permits filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 2793 35th Av | bathroom remodel at 2nd fl. convert e tub to shower. replace e vanity with new double sink vanity, remove e shower, and relocated toilet to previous shower location per plan.Details
bathroom remodel at 2nd fl. convert e tub to shower. replace e vanity with new double sink vanity, remove e shower, and relocated toilet to previous shower location per plan. | $28,000 |
| Mar 30, 2026 | In progress issued Mar 2026 | 2640 Market St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $33,500 |
| Nov 17, 2025 | Completed final sign-off Aug 2026 | 2195 Green St | install 5 new sprinklers at front stair egress per nfpa-13. ref pa #202403278735Details
install 5 new sprinklers at front stair egress per nfpa-13. ref pa #202403278735 | $2,500 |
| Jun 2, 2025 | In progress issued Jun 2025 | 600 Oak St | repair shared 2" galvanized fire/domestic water supply line - repair in city sidewalk.Details
repair shared 2" galvanized fire/domestic water supply line - repair in city sidewalk. | $9,000 |
| May 30, 2025 | Completed final sign-off Jul 2025 | 2300 33rd Av | heat pump water heater installation. replacing existing.Details
heat pump water heater installation. replacing existing. | $14,528 |
| May 5, 2025 | Completed final sign-off May 2025 | 951 Sanchez St | replacing main 2 inch copper water line with copper press fitting repair in kind like for like replacementDetails
replacing main 2 inch copper water line with copper press fitting repair in kind like for like replacement | $25,000 |
| Mar 20, 2025 | Completed final sign-off Apr 2025 | 2250 24th St | unit 234- remove tub enclosure/fiberglass- ropugh in shower valve.reinstall valve trim and fiberglass alcove shower/tub enclosure. no strutural or layout changeDetails
unit 234- remove tub enclosure/fiberglass- ropugh in shower valve.reinstall valve trim and fiberglass alcove shower/tub enclosure. no strutural or layout change | $9,000 |
| Sep 7, 2016 | Completed final sign-off Dec 2016 | 3645 Lawton St | ada bathroom in existing retail space. barrier removalDetails
ada bathroom in existing retail space. barrier removal | $3,200 |
| Nov 19, 2012 | Completed final sign-off Nov 2012 | 1800 Mason St | removal of unpermitted half bath in basement to comply with item 5 and 6 on cc 7117Details
removal of unpermitted half bath in basement to comply with item 5 and 6 on cc 7117 | $300 |
| Sep 23, 2009 | Completed final sign-off Oct 2009 | 143 Graystone Tr | to comply w/ physical inspection report #cc5566 for condo converstion.Details
to comply w/ physical inspection report #cc5566 for condo converstion. | $40,000 |