Ace 1 Electric
- Based in
- Richmond
- On San Francisco permits
- Nov 2025 to Nov 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2025 | In progress filed Nov 2025, not yet issued | 741 Spruce St | solar permit: installing 14 solar pv modules, 270 watts per module, total no. of rating 3.78 kw. mounted: roof, ballasted: n | rooftop mounted solar energy system pv 14 solar modules 1 r10klna inverter system size: 3.78 kw dcDetails
solar permit: installing 14 solar pv modules, 270 watts per module, total no. of rating 3.78 kw. mounted: roof, ballasted: n | rooftop mounted solar energy system pv 14 solar modules 1 r10klna inverter system size: 3.78 kw dc | $12,000 |