Able Construction Dba: De Zhi Jiang
- Based in
- Daly City
- On San Francisco permits
- Dec 2006 to May 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 3 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 562 Head St | remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front doorDetails
remodel (e) house inside main floor: add powder room, add new deck, replace windows with alum clad wood at front. gr fl space converted into 2 bedrooms and 1 full bath. replace front door | $50,000 |
| Apr 3, 2009 | Completed final sign-off Jun 2009 | 463 Moscow St | new rear deck at 2nd. floor. new 1/2 bath, bedroom & storage room @ ground floor per plan & replace (e) windows. add 1 new in the front per plan.Details
new rear deck at 2nd. floor. new 1/2 bath, bedroom & storage room @ ground floor per plan & replace (e) windows. add 1 new in the front per plan. | $30,000 |