Back to bathroom remodel contractors
Able Body Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Nov 2020
- Last 24 months
- 0 permits filed
32 permits since 2000: 27 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 2 never finaled. Typically 12 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2020 | Completed final sign-off Mar 2022 | 2141 Lake St | revision to pa# 201707141964 & 201708104445. detail for fire rated wall assembly. energy calculation for forced air system. remove & resize windows on 1st fl. office & pantry layout. bedroom 3, bathroom 2&3 on 3rd fl. relocate skylights. add wall at bedroom 3.Details
revision to pa# 201707141964 & 201708104445. detail for fire rated wall assembly. energy calculation for forced air system. remove & resize windows on 1st fl. office & pantry layout. bedroom 3, bathroom 2&3 on 3rd fl. relocate skylights. add wall at bedroom 3. | $1,000 |
| Oct 10, 2019 | Completed final sign-off Feb 2020 | 2661 Union St | revision to pa 2019-0924-2495 master bath & plan changesDetails
revision to pa 2019-0924-2495 master bath & plan changes | |
| Sep 24, 2019 | Completed final sign-off Feb 2020 | 2661 Union St | interior remodel of master bathroom & closetDetails
interior remodel of master bathroom & closet | $20,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2019 | 2661 Union St | bathroom remodel. move 2 walls.Details
bathroom remodel. move 2 walls. | $20,000 |
| Jul 18, 2018 | Completed final sign-off Mar 2019 | 2878 Jackson St | install (n) tile floors and counter tops in kitchen, keeping (e) cabinets. install (n) toilet, vanity w/ sink and tile in (e) bathroom, keeping (e) tub. replace plumbing fixtures at kitchen sink, bath sink and shower. no walls moved, removed, added or infilled. all (e) layouts to remain. maher n/aDetails
install (n) tile floors and counter tops in kitchen, keeping (e) cabinets. install (n) toilet, vanity w/ sink and tile in (e) bathroom, keeping (e) tub. replace plumbing fixtures at kitchen sink, bath sink and shower. no walls moved, removed, added or infilled. all (e) layouts to remain. maher n/a | $57,000 |
| Aug 10, 2017 | Completed final sign-off Mar 2022 | 2141 Lake St | vertical expansion under 7' @ 3rd fl to create legal ceiling height @ (e) attic bedrooms & add bathrooms, replace (e) window @ rear facade.Details
vertical expansion under 7' @ 3rd fl to create legal ceiling height @ (e) attic bedrooms & add bathrooms, replace (e) window @ rear facade. | $85,000 |
| Jul 14, 2017 | Completed final sign-off Mar 2022 | 2141 Lake St | (n) master suite @ basement lvl. (n) door & window @ rear to replace (e). remodel kitchen & bath. add poweder rm. 30% interior wall framing removal.Details
(n) master suite @ basement lvl. (n) door & window @ rear to replace (e). remodel kitchen & bath. add poweder rm. 30% interior wall framing removal. | $150,000 |
| May 24, 2017 | Completed final sign-off Dec 2017 | 2661 Union St | interior alterations - relocat hall- interior garage door. remove ground flr partition walls and cabinets, relocate w/d & laundry sink to garage, retile ground flr (e) bath. n/a maher ordinanceDetails
interior alterations - relocat hall- interior garage door. remove ground flr partition walls and cabinets, relocate w/d & laundry sink to garage, retile ground flr (e) bath. n/a maher ordinance | $20,000 |
| Aug 21, 2015 | Never finaled issued Aug 2015, no final | 2136 Leavenworth St | replace 1st,2nd & 3rd floor rear overhang deck in kind. 1st floor: add a storage room, a laundry room and legalize an office/family room and bathroom. revise stair from 1st to 2nd floor. remodel kit. & bath on 2nd fl change all windows facing to the front.Details
replace 1st,2nd & 3rd floor rear overhang deck in kind. 1st floor: add a storage room, a laundry room and legalize an office/family room and bathroom. revise stair from 1st to 2nd floor. remodel kit. & bath on 2nd fl change all windows facing to the front. | $175,000 |
| Jun 10, 2015 | Completed final sign-off Jun 2016 | 104 09th Av | interior remodel on lower unit on 1st flr only. remodel (e) kitchen and relocate (e) bath, add window & patio door at rear building.Details
interior remodel on lower unit on 1st flr only. remodel (e) kitchen and relocate (e) bath, add window & patio door at rear building. | $50,000 |
| Jan 24, 2014 | Completed final sign-off Sep 2014 | 1546 25th Av | build out approx 1/3 of garage area for new master bedroom and bath. remodel e bath on main level and add window in lightwell. infill to match 2ndf l with new interior stairDetails
build out approx 1/3 of garage area for new master bedroom and bath. remodel e bath on main level and add window in lightwell. infill to match 2ndf l with new interior stair | $125,000 |
| Sep 4, 2012 | Never finaled issued Sep 2012, no final | 301 Montcalm St | remodel of (e) kitchen, replace with (n) @ same location. remove bearing wall, replace with tji to carry load, remodel (e) bathroom, replace & add windows.Details
remodel of (e) kitchen, replace with (n) @ same location. remove bearing wall, replace with tji to carry load, remodel (e) bathroom, replace & add windows. | $85,000 |