Abbey Roofing & Constructio
- Based in
- San Mateo
- On San Francisco permits
- Nov 2004 to Apr 2025
- Last 24 months
- 4 permits filed
68 permits since 2000: 51 completed, 1 in progress, 15 never finaled, 1 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2025 | Completed final sign-off Apr 2025 | 330 Presidio Av | to comply with nov 202533564 #6. repair roof at leak location. clean and smooth apply plastic cement at fabric, seal pipe flashings w sikaflex. secure loose metals.Details
to comply with nov 202533564 #6. repair roof at leak location. clean and smooth apply plastic cement at fabric, seal pipe flashings w sikaflex. secure loose metals. | $4,750 |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 51 Presidio Av | reroofing. tear off, install composition shingles, modified bitumen, sheet metal and torch down.Details
reroofing. tear off, install composition shingles, modified bitumen, sheet metal and torch down. | $57,000 |
| Nov 20, 2024 | In progress issued Nov 2024 | 454 Missouri St | reroof, remove and replace (e) shingles and sheet metal, about 3000 sq. ft. no hot workDetails
reroof, remove and replace (e) shingles and sheet metal, about 3000 sq. ft. no hot work | $25,000 |
| Nov 6, 2024 | Completed final sign-off Aug 2025 | 4062 24th St | reroofing - torch workDetails
reroofing - torch work | $30,000 |
| Aug 23, 2024 | Completed final sign-off Jul 2025 | 1921 Sacramento St | reroofing: remove and replace roofing in-kind at front bay and entry areas c & d in attached roof plan.Details
reroofing: remove and replace roofing in-kind at front bay and entry areas c & d in attached roof plan. | $2,500 |
| Aug 9, 2024 | Completed final sign-off Jul 2025 | 1921 Sacramento St | reroofing: flat roof. remove and replace water damaged parapet roofing at rear of property with modified bitumen torch down roofing. remove and replace deteriorated roofing related sheet metal in-kind. roof sections b,e,f & g as shown in plan.Details
reroofing: flat roof. remove and replace water damaged parapet roofing at rear of property with modified bitumen torch down roofing. remove and replace deteriorated roofing related sheet metal in-kind. roof sections b,e,f & g as shown in plan. | $15,000 |
| May 29, 2024 | Completed final sign-off Jun 2024 | 3450 Geary Bl | re-roofingDetails
re-roofing | $62,000 |
| Aug 10, 2023 | Never finaled issued Aug 2023, no final | 1 Rayburn St | reroofingDetails
reroofing | $22,000 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 987 Rhode Island St | reroofing. tear off (e)/install 3-ply modified bitumenDetails
reroofing. tear off (e)/install 3-ply modified bitumen | $55,000 |
| Jul 27, 2022 | Completed final sign-off Dec 2022 | 40 22nd Av | reroofingDetails
reroofing | $75,000 |
| Aug 5, 2020 | Never finaled issued Dec 2020, no final | 238 Townsend St | reroofing, tear off existing roof, installing a class b assembly with coolstar reflective modified bitumen app 20 year roof. new sheet metal flashing. (permit excluding rough carpentry work)Details
reroofing, tear off existing roof, installing a class b assembly with coolstar reflective modified bitumen app 20 year roof. new sheet metal flashing. (permit excluding rough carpentry work) | $70,000 |
| Jun 22, 2020 | Never finaled issued Jun 2020, no final | 2833 25th St | reroof (over garage only)Details
reroof (over garage only) | $24,000 |
| Aug 20, 2019 | Completed final sign-off Oct 2019 | 35 Tamalpais Tr | reroofing.Details
reroofing. | $20,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 2512 Broadway | re-roofing: tear off existing. install app modified bitumen.Details
re-roofing: tear off existing. install app modified bitumen. | $25,000 |
| Jun 4, 2019 | Completed final sign-off Jun 2019 | 2100 Monterey Bl | re-roof. tear off, composite shingle with new sheet metal flashing. in-kind replacement.Details
re-roof. tear off, composite shingle with new sheet metal flashing. in-kind replacement. | $22,000 |
| Jun 3, 2019 | Completed final sign-off Jul 2019 | 2525 Leavenworth St | reroofingDetails
reroofing | $45,000 |
| Mar 5, 2019 | Completed final sign-off Apr 2019 | 501 Filbert St | reroofingDetails
reroofing | $52,000 |
| Jan 15, 2019 | Completed final sign-off May 2020 | 417 Laguna St | partial reroof: front section under desk, install 3 ply app modified bitumen, reinstall deck adfter re-roof.Details
partial reroof: front section under desk, install 3 ply app modified bitumen, reinstall deck adfter re-roof. | $10,250 |
| Sep 4, 2018 | Completed final sign-off Oct 2018 | 2522 25th Av | reroofingDetails
reroofing | $14,000 |
| Jul 30, 2018 | Completed final sign-off Aug 2018 | 1949 Green St | reroofingDetails
reroofing | $12,500 |
| May 2, 2018 | Completed final sign-off Jun 2018 | 1738 Union St | reroofingDetails
reroofing | $22,000 |
| Apr 24, 2018 | Completed final sign-off Dec 2021 | 55 Mississippi St | reroof. tear off, install 3 ply modify bitumen app, new sheetmetal.Details
reroof. tear off, install 3 ply modify bitumen app, new sheetmetal. | $40,000 |
| Oct 31, 2017 | Never finaled issued Oct 2017, no final | 58 Digby St | re-roofingDetails
re-roofing | |
| Jul 11, 2017 | Completed final sign-off Jun 2018 | 2827 Franklin St | reroofingDetails
reroofing | $12,000 |
| Mar 23, 2017 | Completed final sign-off Apr 2017 | 2827 Franklin St | stucco repair, potential wood damage ; repalcemnet of 1 window. not visible to the street. u factor. .32Details
stucco repair, potential wood damage ; repalcemnet of 1 window. not visible to the street. u factor. .32 | $4,200 |
| Mar 2, 2017 | Completed final sign-off Mar 2017 | 349 Avila St | re-roofingDetails
re-roofing | $15,000 |
| Mar 2, 2017 | Completed final sign-off Mar 2017 | 269 29th Av | re-roofingDetails
re-roofing | $14,000 |
| Nov 14, 2016 | Completed final sign-off Dec 2016 | 545 Filbert St | re-roofingDetails
re-roofing | $22,000 |
| Jul 19, 2016 | Completed final sign-off Aug 2017 | 1766 Greenwich St | reroofingDetails
reroofing | $7,000 |
| Jun 22, 2016 | Completed final sign-off Jul 2016 | 275 Upland Dr | reroofing.Details
reroofing. | $14,000 |
| Apr 29, 2016 | Completed final sign-off Jul 2016 | 260 Seacliff Av | re-roofDetails
re-roof | $40,000 |
| Apr 29, 2016 | Completed final sign-off Oct 2016 | 1919 Sacramento St | re-roofDetails
re-roof | $65,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 368 Hill St | dry rot repair, a small amount of wood framing, stucco repair, sheetrock, paint & roofing, 200 sq.ft. in three areas.Details
dry rot repair, a small amount of wood framing, stucco repair, sheetrock, paint & roofing, 200 sq.ft. in three areas. | $7,500 |
| Nov 30, 2015 | Completed final sign-off Jan 2016 | 11 Brush Pl | reroofing.Details
reroofing. | $16,500 |
| Nov 13, 2015 | Completed final sign-off Dec 2015 | 30 Cerritos Av | reroofingDetails
reroofing | $12,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 470 23rd Av | reroofingDetails
reroofing | $18,000 |
| Aug 28, 2015 | Completed final sign-off Sep 2015 | 1766 Greenwich St | re-roofingDetails
re-roofing | $18,500 |
| Jul 28, 2015 | Completed final sign-off Aug 2015 | 346 27th St | re-roofingDetails
re-roofing | $20,000 |
| Apr 30, 2015 | Completed final sign-off Jul 2015 | 32 Terra Vista Av | replace deck membrane (2). tear off; install 3 ply-modified bitumen with sheet metal.Details
replace deck membrane (2). tear off; install 3 ply-modified bitumen with sheet metal. | $5,500 |
| Apr 10, 2015 | Completed final sign-off May 2015 | 515 Wisconsin St | reroofingDetails
reroofing | $10,000 |
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 515 Wisconsin St | add plywood at roof (reroof with plywood)Details
add plywood at roof (reroof with plywood) | $2,500 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 987 Rhode Island St | reroofingDetails
reroofing | $14,500 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 1271 24th Av | reroofingDetails
reroofing | $12,000 |
| Jan 21, 2015 | Never finaled issued Jan 2015, no final | 1578 08th Av | reroofingDetails
reroofing | $10,500 |
| Jan 21, 2015 | Completed final sign-off Aug 2015 | 2586 Clay St | reroofingDetails
reroofing | $5,500 |
| Nov 25, 2014 | Never finaled issued Nov 2014, no final | 54 07th Av | reroofingDetails
reroofing | $13,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 2342 Octavia St | reroofingDetails
reroofing | $12,000 |
| Apr 9, 2014 | Completed final sign-off May 2014 | 3063 Washington St | re-roofingDetails
re-roofing | $16,000 |
| Feb 25, 2014 | Never finaled issued Mar 2014, no final | 2828 Bryant St | reroofingDetails
reroofing | $14,000 |
| Dec 5, 2013 | Completed final sign-off Dec 2013 | 5087 Mission St | reroofingDetails
reroofing | $6,250 |
| Mar 7, 2013 | Completed final sign-off Apr 2013 | 1924 Polk St | reroofingDetails
reroofing | $21,000 |
| Jan 4, 2013 | Completed final sign-off Jan 2013 | 509 Potrero Av | reroofingDetails
reroofing | $14,000 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 79 06th Av | reroofingDetails
reroofing | $7,500 |
| Oct 12, 2011 | Completed final sign-off Nov 2011 | 40 Sussex St | reroofingDetails
reroofing | $6,800 |
| Sep 28, 2011 | Completed final sign-off Oct 2011 | 2222 Bay St | reroofingDetails
reroofing | $10,450 |
| Sep 7, 2011 | Completed final sign-off Oct 2011 | 375 Guerrero St | reroofingDetails
reroofing | $15,200 |
| Jun 15, 2011 | Completed final sign-off Jul 2011 | 1375 Plymouth Av | reroofingDetails
reroofing | $11,450 |
| Nov 16, 2010 | Never finaled issued Nov 2010, no final | 3383 Pacific Av | reroofingDetails
reroofing | $17,500 |
| Oct 18, 2010 | Completed final sign-off Nov 2010 | 30 Florence St | reroofingDetails
reroofing | $12,000 |
| Jul 20, 2010 | Completed final sign-off Jan 2011 | 2571 San Bruno Av | reroofingDetails
reroofing | $12,750 |
| Dec 9, 2008 | Completed final sign-off Jan 2009 | 3843 Mission St | reroofingDetails
reroofing | $8,000 |
| Mar 7, 2007 | Completed final sign-off Mar 2007 | 1165 Bay St | reroofingDetails
reroofing | $22,000 |
| Sep 5, 2006 | Completed final sign-off Jan 2007 | 4770 Mission St | reroofingDetails
reroofing | $35,000 |
| Aug 4, 2006 | Completed final sign-off Aug 2006 | 418 Grafton Av | reroofingDetails
reroofing | $8,000 |
| Jun 9, 2006 | Never finaled issued Jun 2006, no final | 649 Jones St | reroofingDetails
reroofing | $12,000 |
| Oct 11, 2005 | Completed final sign-off Oct 2005 | 2191 30th Av | reroofingDetails
reroofing | $10,000 |
| Jun 22, 2005 | Completed final sign-off Jul 2005 | 330 San Leandro Wy | re-roofing.Details
re-roofing. | $12,500 |
| Nov 22, 2004 | Expired or cancelled expired Apr 2016 | 539 Munich St | reroofingDetails
reroofing | $6,875 |