Back to bathroom remodel contractors
Aaa Windows For Less
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to May 2021
- Last 24 months
- 0 permits filed
74 permits since 2000: 39 completed, 30 never finaled, 5 expired or cancelled.
Of the 30 never-finaled permits, 7 are 5 to 10 years old, 23 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 14 days from filing to permit and 353 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2018 | Completed final sign-off Mar 2019 | 649 Spruce St | legalize lower level floor at unit #1 remodel 2nd flr unit #1, remodel kitchen and bathroom, replace plaster walls with gyp board at 2nd flrDetails
legalize lower level floor at unit #1 remodel 2nd flr unit #1, remodel kitchen and bathroom, replace plaster walls with gyp board at 2nd flr | $40,000 |