A5 Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2022 to Nov 2026
- Last 24 months
- 4 permits filed
8 permits since 2000: 7 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 5
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2026 | In progress issued Nov 2026 | 4376 21st St | to replace the knob + tube wiring in attic with romex. to remove the existing attic insulation, then add new attic insulation when the wiring is complete. to remove attic heat ducts before the insulation work, then replace the attic heat ducts with the ones that got removed.Details
to replace the knob + tube wiring in attic with romex. to remove the existing attic insulation, then add new attic insulation when the wiring is complete. to remove attic heat ducts before the insulation work, then replace the attic heat ducts with the ones that got removed. | $12,000 |
| Oct 20, 2026 | Completed final sign-off Nov 2026 | 530 Potrero Av | exterior stucco repair in courtyard by fire escape, down to sheathing; everything in-kind.Details
exterior stucco repair in courtyard by fire escape, down to sheathing; everything in-kind. | $30,000 |
| Nov 13, 2025 | Completed final sign-off Jan 2026 | 94 South Park | 3/f: bathroom remodel- fixtures, location to remain, like for like.Details
3/f: bathroom remodel- fixtures, location to remain, like for like. | $10,000 |
| Jul 21, 2025 | Completed final sign-off Dec 2025 | 260 King St | unit #271: replacement of the kitchen floor, bathroom floor and tub, all locations to remainDetails
unit #271: replacement of the kitchen floor, bathroom floor and tub, all locations to remain | $33,000 |
| May 10, 2024 | Completed final sign-off May 2024 | 422 Valencia St | unit 403- 20 sqft siding and (1) window replacement in kindDetails
unit 403- 20 sqft siding and (1) window replacement in kind | $30,000 |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 2198 Cayuga Av | building remodel - 3 kitchens, 9 bathrooms. all location to remain. all changes in kind.Details
building remodel - 3 kitchens, 9 bathrooms. all location to remain. all changes in kind. | $500,000 |
| Oct 28, 2022 | Completed final sign-off Dec 2022 | 1540 Ofarrell St | #5. kitchen remodel in-kindDetails
#5. kitchen remodel in-kind | $21,000 |
| May 13, 2022 | Completed final sign-off Jun 2022 | 21 Douglass St | reduce kitchen scope of work for no-plan pa# 202204212745. one bathroom remodel in-kind only. no kitchen remodel. remove scope of work of kitchen.Details
reduce kitchen scope of work for no-plan pa# 202204212745. one bathroom remodel in-kind only. no kitchen remodel. remove scope of work of kitchen. |