Back to bathroom remodel contractors
A2z Construction Co
- Based in
- Pleasant Hill
- On San Francisco permits
- Jul 2012 to Oct 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 2 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 in progress, 1 expired or cancelled. Typically 24 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Aug 2026 | 271 09th Av | improvements at ground fl. 680 sf of existing unconditioned space behind the garage. connected to rear yard greater than 25' depth. emergency egress proposed. re local equiv 8eg oz scope includes approx 20" excavation, new swing/patio doors, elec,plumb, hvac.new den,baths,nook,kitchenetteDetails
improvements at ground fl. 680 sf of existing unconditioned space behind the garage. connected to rear yard greater than 25' depth. emergency egress proposed. re local equiv 8eg oz scope includes approx 20" excavation, new swing/patio doors, elec,plumb, hvac.new den,baths,nook,kitchenette | $170,000 |
| Mar 20, 2014 | Expired or cancelled expired Dec 2016 | 736 24th Av | converting one bathroom into two bathroomsDetails
converting one bathroom into two bathrooms | $11,800 |