Back to bathroom remodel contractors
A W Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Feb 2026
- Last 24 months
- 14 permits filed
159 permits since 2000: 116 completed, 1 in progress, 19 never finaled, 23 expired or cancelled.
Of the 19 never-finaled permits, 3 are 3 to 5 years old, 12 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 33 completed, 2 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2024 | Completed final sign-off Feb 2026 | 351 Valley St | demolish (e) storage & add (n)adu [a state adu (unit 2) at basement] instead with new living room, kitchen, bedrrom & bath.add (n) mechanical room, add (n) tank-less water heater & furnace.Details
demolish (e) storage & add (n)adu [a state adu (unit 2) at basement] instead with new living room, kitchen, bedrrom & bath.add (n) mechanical room, add (n) tank-less water heater & furnace. | $186,372 |
| Dec 5, 2023 | Completed final sign-off Feb 2024 | 1962 Donner Av | 1/f: convert (e) study, storage and laundry to play room. relocate washer and dryer to garage. reduced full bath to powder room. convert family room to kitchenette and add non bearing partition walls per plan.Details
1/f: convert (e) study, storage and laundry to play room. relocate washer and dryer to garage. reduced full bath to powder room. convert family room to kitchenette and add non bearing partition walls per plan. | $30,000 |
| May 2, 2022 | Completed final sign-off Jun 2023 | 2665 Laguna St | front unit: remodel 1 kitchen, 3 bathrooms, 2 powder room, 1 laundry room rear unit: remodel 1 kitchen 3 bathrooms, 1 powder rm, 1 laundry room, basement unit: remodel 1 kitchen & 1 batroomDetails
front unit: remodel 1 kitchen, 3 bathrooms, 2 powder room, 1 laundry room rear unit: remodel 1 kitchen 3 bathrooms, 1 powder rm, 1 laundry room, basement unit: remodel 1 kitchen & 1 batroom | $120,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2020 | 2251 35th Av | 1st fl. convert family room to bedroom, add 2 full bath, media room & rear deck, 2nd fl. remodel bath reocated bedrooms, kitchen, dining & interior stair, add 1 full bath & officeDetails
1st fl. convert family room to bedroom, add 2 full bath, media room & rear deck, 2nd fl. remodel bath reocated bedrooms, kitchen, dining & interior stair, add 1 full bath & office | $120,000 |
| Feb 20, 2019 | Completed final sign-off Aug 2019 | 2239 32nd Av | add new deck at rear of building. legalize existing social room, bedroom & bath on ground floor.Details
add new deck at rear of building. legalize existing social room, bedroom & bath on ground floor. | $35,000 |
| Jun 21, 2018 | Completed final sign-off Dec 2018 | 171 Douglass St | bathroom fixture replacement (both units) window and dryrot repair in lightwell (not visible from st)Details
bathroom fixture replacement (both units) window and dryrot repair in lightwell (not visible from st) | $35,000 |
| Apr 13, 2018 | Completed final sign-off Sep 2018 | 135 Karen Ct | construct new full bathroom in home office roomDetails
construct new full bathroom in home office room | $12,000 |
| Nov 9, 2017 | Completed final sign-off Aug 2018 | 2525 29th Av | remodel (e) bath on ground floor . legalize (e) social room & bedroom at ground floor.Details
remodel (e) bath on ground floor . legalize (e) social room & bedroom at ground floor. | $5,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 311 Surrey St | ground floor bathroom remodel to replace bathtub with shower, repalce 2 sink vanity with single sink vanity. install geci outlet & exhaust fan. replace all windows & doors at rear of bldg (not visible from street).Details
ground floor bathroom remodel to replace bathtub with shower, repalce 2 sink vanity with single sink vanity. install geci outlet & exhaust fan. replace all windows & doors at rear of bldg (not visible from street). | $17,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 1201 32nd Av | kitchen and bathroom remodel in unit 3117 lincoln way. bathroom remodel in unit 1201b 32nd ave. bathroom remodel in unit #1201 32nd ave.Details
kitchen and bathroom remodel in unit 3117 lincoln way. bathroom remodel in unit 1201b 32nd ave. bathroom remodel in unit #1201 32nd ave. | $65,000 |
| Feb 22, 2017 | Completed final sign-off Aug 2017 | 218 Castro St | add additional seismic measures at garage/basement. kitchen & bath remodel at #220 castro street. n/a ordinance #155-13Details
add additional seismic measures at garage/basement. kitchen & bath remodel at #220 castro street. n/a ordinance #155-13 | $18,000 |
| Mar 17, 2015 | Completed final sign-off Aug 2015 | 1040 Broderick St | bathroom remodel at 3rd floor only, build in closet, remove 3/f fire place, chimney and patchwall. replace window sashes at rear & side facade, replace dry rot siding to match existing. add master bath on 3/f. no work at front of bldg.Details
bathroom remodel at 3rd floor only, build in closet, remove 3/f fire place, chimney and patchwall. replace window sashes at rear & side facade, replace dry rot siding to match existing. add master bath on 3/f. no work at front of bldg. | $40,000 |
| Nov 6, 2014 | Completed final sign-off May 2015 | 2259 31st Av | add two bedrooms, one bath, one entertainment room on 1st floor per plan.Details
add two bedrooms, one bath, one entertainment room on 1st floor per plan. | $20,000 |
| Sep 5, 2014 | Expired or cancelled expired May 2024 | 148 Terra Vista Av | revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls.Details
revision to approved building permit 200505233203& pa#2014-0110-5988; interior work on segment 2 ground floor only, remove bathroom #2 and revise interior walls. | |
| Nov 6, 2013 | Completed final sign-off May 2014 | 1962 Donner Av | to comply w/complaint #201333981 - to add one bedroom, one family room, one study room, one full bathroom, one laundry & storage on existing ground floor per plan.Details
to comply w/complaint #201333981 - to add one bedroom, one family room, one study room, one full bathroom, one laundry & storage on existing ground floor per plan. | $60,000 |
| Mar 23, 2012 | Completed final sign-off Jun 2012 | 430 Fell St | to remodel bathroom at 2nd. floor.Details
to remodel bathroom at 2nd. floor. | $10,000 |
| Sep 12, 2011 | Completed final sign-off Jul 2012 | 758 40th Av | add 2 bedrooms, 2 baths, 1 family room on 1st floorDetails
add 2 bedrooms, 2 baths, 1 family room on 1st floor | $30,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 33 Ord Ct | scope of work to remodel bathroom 2nd floor, extend kitchen cabinet, replace (e) countertop to new granite-countertop.Details
scope of work to remodel bathroom 2nd floor, extend kitchen cabinet, replace (e) countertop to new granite-countertop. | $16,000 |
| Dec 9, 2010 | Completed final sign-off May 2011 | 516 Church St | to remodel bathroom, kitchen remodel, provide high efficiency lights, manual on occupancy sensor.Details
to remodel bathroom, kitchen remodel, provide high efficiency lights, manual on occupancy sensor. | $28,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 75 Bessie St | to remodel extg bathroom and kitchen. no lightingDetails
to remodel extg bathroom and kitchen. no lighting | $18,000 |
| Jan 5, 2010 | Completed final sign-off Jul 2010 | 2635 Buchanan St | to remodel (e) 2-baths in-kind (no-structural work). relocate (e) door within same wall.Details
to remodel (e) 2-baths in-kind (no-structural work). relocate (e) door within same wall. | $20,000 |
| Nov 3, 2009 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | remodel of the 2nd & 3rd floor - work to include 2 new bathrooms, plumbing, lighting, windows, new deck over (e) bay window.Details
remodel of the 2nd & 3rd floor - work to include 2 new bathrooms, plumbing, lighting, windows, new deck over (e) bay window. | $115,900 |
| Sep 22, 2009 | Completed final sign-off Jul 2010 | 483 Mississippi St | bathroom remodel, 3 replacement windows, mech, elec, plumbing, new laundry room, interior doors. approx. 7'-6" x 10'0" bathroom; new plumbing fixtures, lighting, interior finishes. work on floor 3 at 483 mississippi.Details
bathroom remodel, 3 replacement windows, mech, elec, plumbing, new laundry room, interior doors. approx. 7'-6" x 10'0" bathroom; new plumbing fixtures, lighting, interior finishes. work on floor 3 at 483 mississippi. | $18,000 |
| Jun 24, 2009 | Completed final sign-off Feb 2010 | 2170 33rd Av | enclose laundry area, relocate (e) bathroom, change (e) door to (n) french door and legalize (e) fam. rm and den/office at garage floor.Details
enclose laundry area, relocate (e) bathroom, change (e) door to (n) french door and legalize (e) fam. rm and den/office at garage floor. | $25,000 |
| Oct 17, 2008 | Completed final sign-off Nov 2008 | 2635 Buchanan St | remodel existing bathroom in ground floor unit in kind. no structure work and replace 2 windows . windows in rear.Details
remodel existing bathroom in ground floor unit in kind. no structure work and replace 2 windows . windows in rear. | $15,000 |
| Jul 25, 2008 | Completed final sign-off Jan 2009 | 4775 19th St | remodel bathroom in 2/f in kind. no structural work.Details
remodel bathroom in 2/f in kind. no structural work. | $8,500 |
| Feb 1, 2007 | Expired or cancelled expired Mar 2013 | 1334 Masonic Av | 216 sq foot single story addition to rear of extg wood frame residence. new kitchen and bathroom. new concrete on grade staircase at exterior.Details
216 sq foot single story addition to rear of extg wood frame residence. new kitchen and bathroom. new concrete on grade staircase at exterior. | $85,000 |
| Jan 22, 2007 | Completed final sign-off Nov 2007 | 280 Waller St | remove existing lath & plaster existing bathroom & new 5/8" sheetrock. add 2 bathrooms & laundry room and remodel kitchen on 1/f & 3/f. new steel header, front window, from aluminum to wood.Details
remove existing lath & plaster existing bathroom & new 5/8" sheetrock. add 2 bathrooms & laundry room and remodel kitchen on 1/f & 3/f. new steel header, front window, from aluminum to wood. | $170,000 |
| Aug 21, 2006 | Completed final sign-off Apr 2008 | 33 Ord Ct | scope of work: to add two story to the right side elevation of the house, first floor of 10' 6" x 14' 0" and 2nd floor is 13' 6" x 14'. the existing 2nd floor bedroom to be remodeled to have a bathroom, closets and washer/dryer.Details
scope of work: to add two story to the right side elevation of the house, first floor of 10' 6" x 14' 0" and 2nd floor is 13' 6" x 14'. the existing 2nd floor bedroom to be remodeled to have a bathroom, closets and washer/dryer. | $33,000 |
| Sep 23, 2005 | Completed final sign-off Feb 2006 | 165 27th Av | remodel (e) 2/fl bathroom (master bathroom) no charge in layout & opening . non structural.Details
remodel (e) 2/fl bathroom (master bathroom) no charge in layout & opening . non structural. | $10,000 |
| Jul 7, 2005 | Completed final sign-off Apr 2007 | 336 Missouri St | remodel (e)kitchen, bathroom.no structural work.Details
remodel (e)kitchen, bathroom.no structural work. | $20,000 |
| May 4, 2005 | Completed final sign-off Apr 2006 | 1857 37th Av | remodel (e) kitchen, 2 bathroom,all on upper level.no change in layout & openingsDetails
remodel (e) kitchen, 2 bathroom,all on upper level.no change in layout & openings | $35,000 |
| Mar 22, 2005 | Completed final sign-off May 2005 | 1477 05th Av | remodel (e)bathroom in 2/f,repair dryrot damage light-well on 2/f,repair in kindDetails
remodel (e)bathroom in 2/f,repair dryrot damage light-well on 2/f,repair in kind | $12,000 |
| Aug 21, 2003 | Completed final sign-off Apr 2004 | 2145 20th Av | to remodel extng kitchen & bathroom in main floor. replace concrete slab w/ waterproofing on groundDetails
to remodel extng kitchen & bathroom in main floor. replace concrete slab w/ waterproofing on ground | $50,000 |
| Mar 24, 2003 | Completed final sign-off Jul 2003 | 139 Beverly St | repair dryrot & stucco work of rear bldg (e)no structure work & remodel half bath.Details
repair dryrot & stucco work of rear bldg (e)no structure work & remodel half bath. | $10,000 |
| Sep 27, 2002 | Completed final sign-off Mar 2003 | 342 18th Av | to remodel kitchen, bathroom (e). no structural work.Details
to remodel kitchen, bathroom (e). no structural work. | $20,000 |
| Jun 17, 2002 | Completed final sign-off Dec 2002 | 601 Moraga St | to remodel e kitchen and e half bath 'Details
to remodel e kitchen and e half bath ' | $18,000 |
| Feb 12, 2002 | Completed final sign-off Sep 2002 | 601 Moraga St | to remode ( e) 2 bath rooms i laundry roomDetails
to remode ( e) 2 bath rooms i laundry room | $15,000 |